Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Kitts and Nevis · Port

Structural steel shipped to Basseterre and Nevis

Cargo for St Kitts comes in through the Basseterre Deep Water Port, just east of the capital. Nevis has its own cargo port at Long Point and the pier at Charlestown, and the two islands are linked by ferries and cargo boats across the Narrows. A single ring road circles each island. We pack for every leg, so loads reach site with the next area to erect.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Basseterre.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
St Kitts
Basseterre Deep Water Port
Nevis
Long Point and Charlestown
Roads
One ring road per island
Tracking
Live in PEB Studio

Route

Where steel lands on each island

Basseterre Deep Water Port

The main cargo port for St Kitts, beside the capital.

Long Point Port, Nevis

Cargo port on the Nevis west coast, south of Charlestown.

Charlestown, Nevis

Pier and ferry terminal in the Nevis capital.

Ring roads

One road around each island, with the South East Peninsula road to the resorts.

Packing

Packed for two islands

Erection order

Bundles follow the erection sequence, area by area.

Piece marks

Every member marked to the erection drawings before it ships to Basseterre.

Bundle lists

A packing list per bundle and a master list per shipment.

Split by island

Containers packed per island, so Nevis loads go straight across.

Who does what

Shipping work, split clearly

World Steel supplies

  • Packing in erection order with piece marks for Basseterre
  • Packing lists and shipping documents
  • Wood packaging treated for export to St Kitts and Nevis where used
  • Loading photos for every container
  • Shipment tracking in PEB Studio

The contractor or importer arranges

  • Import clearance and duties
  • Port charges and haulage
  • Any crossing between the islands
  • Unloading, storage and cranes on site
  • Erection

St Kitts and Nevis

What we do not claim

St Kitts and Nevis is supplied FOB Vietnam or CIF Basseterre only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Basseterre takes about 45 days; the route and costs are confirmed in each quotation.

Products and solutions

The World Steel pages behind this guide

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your St Kitts and Nevis project is cut, welded, inspected and packed.

Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Caribbean logistics

Ports for St Kitts and Nevis: shipped from our plant in Vietnam

Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers

All Caribbean ports and routes

Q&A

What Kittitian and Nevisian buyers ask

Which port does steel for St Kitts use?

The Basseterre Deep Water Port. Every site on St Kitts is a short haul from there by the ring road.

How does steel reach Nevis?

Either direct to Long Point or Charlestown, or through Basseterre and across the Narrows. The quotation confirms the route.

Who clears the steel through customs?

The importer of record in St Kitts and Nevis, usually the contractor or owner, with a customs broker. We supply the commercial documents.

Contact World Steel · St Kitts and Nevis

Talk to us about steel for St Kitts and Nevis

WhatsApp, email or a video call with our engineers, booked at an hour that suits Basseterre. Our contact page for St Kitts and Nevis has the ports, the local time and the form.