Routes
How steel reaches a Guyanese site
Georgetown wharves
Container and breakbulk berths on the Demerara for most cargo.
Berbice and New Amsterdam
River berths for the east and the Corentyne coast.
Linden and the interior road
The Linden road, then the highway south toward Lethem.
By river and air
Barges up the Essequibo, Demerara and Berbice; light members by air to hinterland strips.
Packing
Packed for the last leg too
Erection order
Bundles follow the erection sequence so the first steel off the truck is the first steel up.
Piece marks
Every member marked to the erection drawings, as on the footbridges.
Barge and truck sizes
Bundle weights and lengths planned for barges, trucks and river crossings.
Bundle lists
A packing list for every bundle and a master list per shipment.
Who does what
Shipping work, split clearly
World Steel supplies
- Packing in erection order with piece marks for Georgetown
- Packing lists and shipping documents
- Wood packaging treated for export to Guyana where used
- Loading photos for every container
- Shipment tracking in PEB Studio
The contractor or importer arranges
- Import clearance and duties in Guyana
- Wharf charges and haulage
- Barge or air freight inland
- Unloading and storage on site
- Cranes and erection
Guyana
What we do not claim
Guyana is supplied FOB Vietnam or CIF Georgetown only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Georgetown takes about 45 days; the route and costs are confirmed in each quotation.
Products and solutions
The World Steel pages behind this guide
Guyana region by region
How this applies in your region
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Guyanese project is cut, welded, inspected and packed.
Caribbean logistics
Ports for Guyana: shipped from our plant in Vietnam
Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers
Q&A
What Guyanese buyers ask
Which port do you ship to in Guyana?
Georgetown on the Demerara River for most projects. We plan onward transport with your logistics team.
Can you ship long bridge spans to Guyana?
Yes. For the 18 Guyana footbridges, spans were split into shippable segments with bolted splices, drilled from templates in our plant.
Can steel go to an interior site by barge?
Yes. We size and weigh the bundles for the barge and the landing, and mark them for the order they will be lifted.
Official sources: Maritime Administration Department, Guyana
Guyana solutions
Every Guyana guide
Related pages
Code facts on this page summarize Guyanese practice and the standards it references. They are not legal or engineering advice; your engineer of record and the local authority confirm the code and edition in force for your project.
Contact World Steel · Guyana
Talk to us about steel for Guyana
WhatsApp, email or a video call with our engineers, booked at an hour that suits Georgetown. Our contact page for Guyana has the ports, the local time and the form.