Route
Where Grenadian steel lands
Port of St George’s
Container and cargo port in the capital’s harbour.
South coast
Short roads to Grand Anse, True Blue, the airport and St David.
Western Main Road and the Grand Etang road
Winding routes north to Gouyave, Sauteurs and Grenville.
Carriacou and Petite Martinique
Cargo vessel or barge from St George’s to Hillsborough.
Packing
Packed for hills and islands
Erection order
Bundles follow the erection sequence, area by area.
Piece marks
Every member marked to the erection drawings before it ships to St George’s.
Bundle lists
A packing list per bundle and a master list per shipment.
Sized for the route
Members split for hill roads and sized for the vessel to Carriacou.
Who does what
Shipping work, split clearly
World Steel supplies
- Packing in erection order with piece marks for St George’s
- Packing lists and shipping documents
- Wood packaging treated for export to Grenada where used
- Loading photos for every container
- Shipment tracking in PEB Studio
The contractor or importer arranges
- Import clearance and duties
- Port charges and haulage
- The sea leg to the sister islands
- Unloading, storage and cranes on site
- Erection
Grenada
What we do not claim
Grenada is supplied FOB Vietnam or CIF St George’s only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to St George’s takes about 45 days; the route and costs are confirmed in each quotation.
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
Grenada has 7 parishes. Open St John, Carriacou and Petite Martinique or St George to see the local wind, ground and coast, the road from St George’s and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Grenada project is cut, welded, inspected and packed.
Caribbean logistics
Ports for Grenada: shipped from our plant in Vietnam
Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers
Q&A
What Grenadian buyers ask
Which port does steel for Grenada use?
The Port of St George’s. Every project on the main island is served from there by road.
How does steel reach Carriacou?
It lands at St George’s and goes on by cargo vessel or barge to Hillsborough. We size bundles and members for that leg.
Who clears the steel through customs?
The importer of record in Grenada, usually the contractor or owner, with a customs broker. We supply the commercial documents.
Official sources: Grenada Ports Authority
Grenada solutions
Every Grenada guide
Related pages
Code facts on this page summarize practice in Grenada and the standards it references. They are not legal or engineering advice; your engineer of record and the Planning and Development Authority confirm the code and edition in force for your project.
Contact World Steel · Grenada
Talk to us about steel for Grenada
WhatsApp, email or a video call with our engineers, booked at an hour that suits St George’s. Our contact page for Grenada has the ports, the local time and the form.