Route
Where Curaçao steel lands
Container terminal, Schottegat
The island’s cargo port in Willemstad’s inner harbour.
West to Bandabou
Roads out to the villages, beaches and Westpunt.
Willemstad and Hato
The capital, the industrial areas and the airport.
East to Bandariba
Short hauls to Spanish Water, Jan Thiel and Santa Barbara.
Packing
Packed for an island harbour
Erection order
Bundles follow the erection sequence, building by building.
Piece marks
Every member marked to the erection drawings before it ships to Willemstad.
Bundle lists
A packing list per bundle and a master list per shipment.
Timed releases
Shipments released to match sites with little laydown space.
Who does what
Shipping work, split clearly
World Steel supplies
- Packing in erection order with piece marks for Willemstad
- Packing lists and shipping documents
- Wood packaging treated to ISPM 15 where used
- Loading photos for every container
- Shipment tracking in PEB Studio
The contractor or importer arranges
- Import clearance and duties
- Port charges and haulage
- Unloading and storage
- Cranes on site
- Erection
Curaçao
What we do not claim
Curaçao is supplied FOB Vietnam or CIF Willemstad only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Willemstad takes about 45 days; the route and costs are confirmed in each quotation.
Products and solutions
The World Steel pages behind this guide
Area by area
How this applies in your area
Curaçao has 3 areas. Open Bandabou, Willemstad or Bandariba to see the local wind, ground and coast, the road from Willemstad and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Curaçao project is cut, welded, inspected and packed.
Caribbean logistics
Ports for Curaçao: shipped from our plant in Vietnam
Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers
Q&A
What Curaçaoan buyers ask
Which port does steel for Curaçao use?
The port of Willemstad, with its container terminal in the Schottegat.
Can long members reach Westpunt?
Yes. The roads to the west are longer but open; we confirm member lengths for the route to your site.
Who clears the steel through customs?
The importer of record in Curaçao, usually the contractor or owner, with a customs broker. We supply the commercial documents.
Curaçao solutions
Every Curaçao guide
Related pages
Code facts on this page summarize practice in Curaçao and the standards it references. They are not legal or engineering advice; your engineer of record and the planning and building department confirm the code and edition in force for your project.
Contact World Steel · Curaçao
Talk to us about steel for Curaçao
WhatsApp, email or a video call with our engineers, booked at an hour that suits Willemstad. Our contact page for Curaçao has the ports, the local time and the form.