Project types
What we fabricate for Dominican industry
Free-zone factories
Clear-span plants with mezzanines and roof loads for services.
Warehouses and logistics
Distribution centres with high bays and dock doors.
Crane bays
Runway beams and crane columns, with cranes supplied on request.
Cold stores
Cold stores for produce, food distribution and export.
Power and utilities
Power plant buildings, pipe racks and tank supports.
Mining and processing
Process buildings, conveyors and workshops.
Speed
A tenant waiting, a programme to keep
We fabricate while your site pours the slab, then ship building by building in erection order. Roof and wall cladding, purlins, girts and crane runway beams can come in the same package.
Large packages are released by area. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Who does what
Project work, split clearly
World Steel supplies
- Steel design or detailing to the Dominican building regulations
- Fabrication, coating and QC release
- Cladding, purlins, girts and crane beams
- Packing by area and shipping to the nearest port
- Shop and erection drawings, included
The contractor arranges
- Owner contract and permits
- Engineer of record approval
- Slab, foundations and anchor bolts
- Erection and cladding installation
- Services and fit-out
Products and solutions
The World Steel pages behind this guide
Province by province
How this applies in your province
The Dominican Republic has 32 provinces. Open Sánchez Ramírez, Duarte or Hermanas Mirabal to see the local wind, ground and coast, the road from Caucedo and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Dominican Republic project is cut, welded, inspected and packed.
Q&A
What Dominican buyers ask
Can you supply a whole free-zone park?
Yes. We release each building as its own package, in the order your site needs them.
Do you supply overhead cranes?
Yes, on request with the building, with runway beams and crane columns designed together.
Do you work with local contractors?
Yes. Contractors in the Dominican Republic are our customers: they win the work and erect it, and we design, fabricate and supply the steel.
Dominican Republic solutions
Every Dominican Republic guide
Related pages
Code facts on this page summarize practice in the Dominican Republic and the standards it references. They are not legal or engineering advice; your engineer of record and MIVED and the municipality confirm the code and edition in force for your project.
Contact World Steel · Dominican Republic
Talk to us about steel for the Dominican Republic
WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.