Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Distrito Nacional · District

Steel buildings and structural steel for Distrito Nacional, Santo Domingo

The Distrito Nacional is the heart of Santo Domingo, with the Colonial Zone, the first European city in the Americas, government, the business districts of Piantini and Naco, hospitals, universities and hotels on the Malecón.

Santo Domingo and the east · Provincial capital Santo Domingo de Guzmán

Site conditions in Distrito Nacional

What the site asks of your steel

Seismic
Southern faults
Wind
Hurricanes from the south
Ground
Limestone and fill
Access
Dense city sites

Our design note. The Distrito Nacional builds office towers, shopping centres, hospitals and parking on dense city sites. Composite floors, seismic detailing and floor-by-floor deliveries shape the steel.

Distrito Nacional at a glance

The ground, the work and the road in

Ground and climate

Limestone terraces and coastal fill.

What gets built

Government, finance, commerce, healthcare, education and tourism.

Getting steel there

About thirty minutes from Caucedo or Haina.

Towns: Santo Domingo · Zona Colonial · Piantini · Naco · Gazcue

Steel we recommend

What we fabricate for Distrito Nacional

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Multi-storey buildings

Steel frames with composite deck for offices, apartments, hospitals and schools.

Multi-storey steel framing →

Commercial buildings

Shopping centres, showrooms, offices and mixed-use blocks.

Commercial steel buildings →

Schools, halls and sports

Classrooms, community halls, sports buildings and shelters.

Sports facilities and arenas →

Contractors in Distrito Nacional

You win the job in Distrito Nacional. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Distrito Nacional

Can you supply office towers in Santo Domingo?

Yes. Composite steel frames with long spans, delivered level by level for tight sites.

Can you supply hospital buildings?

Yes. Composite frames detailed for the importance factor your engineer sets.

Santo Domingo and the east

Other provinces: santo domingo and the east

The capital, Santo Domingo province with Caucedo and Las Américas, and the east from San Pedro de Macorís to Punta Cana.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Dominican Republic. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Dominican Republic

Talk to us about steel for Distrito Nacional

Send the drawings or the site, size and use. We design or detail the steel for Distrito Nacional’s earthquake, hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Caucedo. WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.