By region
How the region changes the seismic case
Your engineer of record confirms the values for each site.
| Region | What changes |
|---|---|
| Cibao valley, Santiago to San Francisco de Macorís | Close to the Septentrional fault, deep valley soils |
| North coast, Puerto Plata to Samaná | Offshore faults and coastal soils |
| Santo Domingo and the south coast | Limestone terraces and coastal fill |
| The east, La Romana to Punta Cana | Limestone plain, lower hazard than the north |
| The south-west valleys | Active faults and soft lake and river soils |
Seismic frames
How we detail for earthquakes
Moment frames
Portal and multi-bay frames for factories, warehouses and halls.
Braced frames
Concentric and eccentric bracing for hotels, offices and hospitals.
AWS D1.8 welding
Qualified procedures and welders for demand-critical welds.
Base plates and anchors
Base plates sized for uplift and seismic shear together.
Who does what
Seismic work, split clearly
World Steel supplies
- Frames detailed to AISC 341 where the design calls for it
- Protected-zone marking on request
- Base plates, anchor bolt plans and templates
- Plate with EN 10204 3.1 certificates and CVN on request
- Remote or in-person inspector access
In Dominican Republic, the contractor and the engineer of record arrange
- Soil study and site data
- Seismic parameters under R-001
- Foundation design and construction
- Inspections on site
- Erection to the drawings
Dominican Republic
What we do not claim
We do not certify buildings for an earthquake magnitude. The design is checked by your engineer of record for the values set for your site.
Products and solutions
The World Steel pages behind this guide
Province by province
How this applies in your province
The Dominican Republic has 32 provinces. Open Valverde, Monte Cristi or Dajabón to see the local wind, ground and coast, the road from Caucedo and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Dominican Republic project is cut, welded, inspected and packed.
Q&A
What Dominican buyers ask
Why steel in an earthquake zone?
A steel frame is light and ductile: it bends and absorbs energy instead of breaking, and it puts less load on the foundations than concrete.
Is Santiago at higher risk than Santo Domingo?
The Cibao valley lies close to the Septentrional fault, so seismic values there are usually higher. Your engineer sets them for each site.
Do you supply welders’ qualifications?
Yes. Our shop holds AWS D1.8-qualified procedures and welders, and records travel with the steel.
Dominican Republic solutions
Every Dominican Republic guide
Related pages
Code facts on this page summarize practice in the Dominican Republic and the standards it references. They are not legal or engineering advice; your engineer of record and MIVED and the municipality confirm the code and edition in force for your project.
Contact World Steel · Dominican Republic
Talk to us about steel for the Dominican Republic
WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.