Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Haiti · Ports

Structural steel shipped to Port-au-Prince and Cap-Haïtien

Haiti’s main gateways are the port of Port-au-Prince and the port of Cap-Haïtien in the north, with smaller ports along the coast. For each shipment we confirm the port and route with the importer, so steel lands where it can be cleared and trucked safely to site. Packing in erection order means the first truck carries the first area to erect.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Port-au-Prince or Cap-Haïtien.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Ports
Port-au-Prince, Cap-Haïtien
Route
Confirmed per shipment
Packing
Erection order
Tracking
Live in PEB Studio

Route

Where Haitian steel lands

Port-au-Prince

The main container and cargo port, serving the west and the south.

Cap-Haïtien

The northern port, close to the Nord-Est industrial parks.

Coastal ports

Smaller ports such as Les Cayes, Jacmel and Gonaïves for local cargo.

Route to site

National roads to each department, planned with your haulier.

Packing

Packed for the road to site

Erection order

Bundles follow the erection sequence, area by area.

Piece marks

Every member marked to the erection drawings before it ships to Port-au-Prince.

Bundle lists

A packing list per bundle and a master list per shipment.

Container-sized pieces

Members sized for containers and mountain roads.

Who does what

Shipping work, split clearly

World Steel supplies

  • Packing in erection order with piece marks for Port-au-Prince
  • Packing lists and shipping documents
  • Wood packaging treated for export to Haiti where used
  • Loading photos for every container
  • Shipment tracking in PEB Studio

The contractor or importer arranges

  • Import clearance and duties or exemptions
  • Port charges and haulage
  • Secure storage on site
  • Cranes and erection
  • Route planning to site

Haiti

What we do not claim

Haiti is supplied FOB Vietnam or CIF Port-au-Prince only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Port-au-Prince takes about 45 days; the route and costs are confirmed in each quotation.

Products and solutions

The World Steel pages behind this guide

Department by department

How this applies in your department

Haiti has 10 departments. Open Artibonite, Sud or Nord-Est to see the local wind, ground and coast, the road from Port-au-Prince and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Haiti project is cut, welded, inspected and packed.

Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Caribbean logistics

Ports for Haiti: shipped from our plant in Vietnam

Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers

All Caribbean ports and routes

Q&A

What Haitian buyers ask

Which port should steel for Haiti use?

Port-au-Prince for the west and south, Cap-Haïtien for the north, or a smaller port where it suits. We confirm the port with the importer for each shipment.

Which trade terms do you ship on?

FOB or CIF, the only two terms World Steel supplies on in the Caribbean, named in each quotation; the importer handles clearance and delivery from the port.

Who clears the steel through customs?

The importer of record, usually the contractor, owner or funder’s agent, with a customs broker. We supply the commercial documents.

Contact World Steel · Haiti

Talk to us about steel for Haiti

WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.