Site conditions in Santo Domingo
What the site asks of your steel
- Seismic
- Southern faults
- Wind
- South coast hurricanes
- Air
- Coastal salt near Caucedo
- Ground
- Limestone and river soils
Our design note. Santo Domingo province builds logistics parks, free-zone factories and airport buildings beside Caucedo. Clear spans, crane bays and seismic detailing shape the steel.
Santo Domingo at a glance
The ground, the work and the road in
Ground and climate
Limestone terraces, coastal plain and river soils.
What gets built
Logistics, free zones, industry, commerce and tourism.
Getting steel there
The port of Caucedo is in the province.
Towns: Santo Domingo Este · Santo Domingo Norte · Santo Domingo Oeste · Boca Chica · Los Alcarrizos
Steel we recommend
What we fabricate for Santo Domingo
The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.
Warehouses and logistics
Clear-span warehouses and distribution centres near the ports and highways.
Warehouse and distribution buildings →Free-zone factories
Portal frames and crane bays for free-zone and industrial plants.
Manufacturing plants and crane bays →Hangars and terminals
Long-span frames for hangars, cargo sheds and terminal buildings.
Aircraft hangar buildings →Contractors in Santo Domingo
You win the job in Santo Domingo. We fabricate the steel.
Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.
Q&A
Questions about steel in Santo Domingo
Can you supply logistics parks near Caucedo?
Yes. Clear-span warehouses and distribution centres, packed building by building.
Can you supply airport buildings?
Yes. Hangar and cargo frames with doors designed into the wind case.
Santo Domingo and the east
Other provinces: santo domingo and the east
The capital, Santo Domingo province with Caucedo and Las Américas, and the east from San Pedro de Macorís to Punta Cana.
Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Dominican Republic. World Steel designs and fabricates the steel; the contractor erects it.
Contact World Steel · Dominican Republic
Talk to us about steel for Santo Domingo
Send the drawings or the site, size and use. We design or detail the steel for Santo Domingo’s earthquake, hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Caucedo. WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.