Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Dominican Republic · Hurricanes and coasts

Hurricane and salt-air design for Dominican steel buildings

Hurricanes cross the Dominican Republic from the east and south: David in 1979 and Georges in 1998 did damage across the country, and Fiona struck the east around Punta Cana in 2022. Most resorts sit on the beach, where wind, surge and salt work together. We design the whole load path for the wind your engineer sets and choose coatings for each exposure, from inland valleys to the beachfront.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Caucedo.

Six-story steel frame seen from the front, floor deck in place
Going up beside the plant in Vietnam: World Steel framed its own office building.
Storms
David 1979, Georges 1998, Fiona 2022
Critical zones
Roof edges and openings
Coasts
Salt and surge
Coatings
Jotun, PPG, Hempel and more

Where storms win

Four places we check first

Roof uplift

On roofs in the Dominican Republic, edge and corner zones carry much more suction than the middle.

Large openings

A failed door or window pressurizes the building; we design for it.

Connections

Purlin cleats, flange braces and anchors carry reversing storm loads.

Surge on the beach

Beachfront floors and bases are designed for the levels your engineer sets.

Exposure

Matching the coating to the site

Typical choices for the Dominican Republic, confirmed with your engineer for each project.

SiteTypical protection
Enclosed, air-conditioned buildingZinc-rich primer and finish coat on sheltered steel
Santiago and the inland valleysZinc-rich primer, epoxy intermediate, polyurethane finish
Santo Domingo and the south coastHigh-build epoxy system with polyurethane finish
Beachfront resorts, Punta Cana to Puerto PlataMarine-grade high-build system or duplex
Ports, docks and marinasHot-dip galvanizing or duplex systems

In our plant

How coating quality is built in

Blast cleaning

Members for the Dominican Republic are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for the Dominican Republic.

Measured film

Dry film thickness measured and recorded for every member shipped to the Dominican Republic.

Dominican Republic

What we do not claim

We do not publish wind ratings or certify buildings in the Dominican Republic for a hurricane category. The design is checked by your engineer of record for the loads set for your site in the Dominican Republic.

Products and solutions

The World Steel pages behind this guide

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Dominican Republic project is cut, welded, inspected and packed.

Welded members with drilled end plates laid out side by side
Members with drilled end plates waiting for release, Vietnam plant.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.

Q&A

What Dominican buyers ask

Which coast is most exposed to hurricanes?

The east and south coasts see the most storms, but the north coast takes wind and swell too. Your engineer sets the wind speed for each site.

Should beachfront resort steel be galvanized?

Exposed steel close to the sea often is, or gets a duplex system for the longest life.

Can we buy matching touch-up paint?

Yes. The brands we use are sold in the Dominican Republic, and each shipment names the products.

Contact World Steel · Dominican Republic

Talk to us about steel for the Dominican Republic

WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.