Route
Where Dominican steel lands
Caucedo
The container port east of Santo Domingo, close to the east coast highways.
Río Haina
The port west of the capital, beside the Haina industrial area.
Puerto Plata
The north coast port for the Cibao and the north coast resorts.
Highways
Roads to Santiago, Punta Cana, Samaná and the south-west.
Packing
Packed for long highway hauls
Erection order
Bundles follow the erection sequence, area by area.
Piece marks
Every member marked to the erection drawings before it ships to Caucedo.
Bundle lists
A packing list per bundle and a master list per shipment.
Timed releases
Shipments released to match the site programme.
Who does what
Shipping work, split clearly
World Steel supplies
- Packing in erection order with piece marks for Caucedo
- Packing lists and shipping documents
- Wood packaging treated for export to the Dominican Republic where used
- Loading photos for every container
- Shipment tracking in PEB Studio
The contractor or importer arranges
- Import clearance and duties
- Port charges and haulage
- Free-zone procedures where they apply
- Unloading, storage and cranes on site
- Erection
Dominican Republic
What we do not claim
The Dominican Republic is supplied FOB Vietnam or CIF Caucedo only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Caucedo takes about 45 days; the route and costs are confirmed in each quotation.
Products and solutions
The World Steel pages behind this guide
Province by province
How this applies in your province
The Dominican Republic has 32 provinces. Open María Trinidad Sánchez, Samaná or San Cristóbal to see the local wind, ground and coast, the road from Caucedo and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Dominican Republic project is cut, welded, inspected and packed.
Caribbean logistics
Ports for the Dominican Republic: shipped from our plant in Vietnam
Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers
Q&A
What Dominican buyers ask
Which port is best for Punta Cana?
Usually Caucedo, with the highway east. We confirm the route with your team.
Which port is best for Santiago?
Puerto Plata is closest; Caucedo or Haina can also suit, depending on the shipping line.
Who clears the steel through customs?
The importer of record in the Dominican Republic, usually the contractor or owner, with a customs broker. Free-zone tenants follow free-zone procedures. We supply the commercial documents.
Dominican Republic solutions
Every Dominican Republic guide
Related pages
Code facts on this page summarize practice in the Dominican Republic and the standards it references. They are not legal or engineering advice; your engineer of record and MIVED and the municipality confirm the code and edition in force for your project.
Contact World Steel · Dominican Republic
Talk to us about steel for the Dominican Republic
WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.