World Steel USA

Antigua and Barbuda · Port

Structural steel shipped to St John’s, Antigua and Barbuda

Heavy cargo for both islands comes in through St John’s Deep Water Harbour, on the north side of the capital. No site on Antigua is far by road. Steel for Barbuda goes on by barge or landing craft to the jetty near Codrington, about 50 km to the north. We pack for both legs, so every load reaches site with the next area to erect.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to St John’s.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Port
St John’s Deep Water Harbour
Antigua
Short road hauls
Barbuda
Onward sea leg
Tracking
Live in PEB Studio

Route

Where the steel lands

St John’s Deep Water Harbour

Container and cargo port on the north side of St John’s Harbour.

Sir Sydney Walling Highway and the airport road

Roads east to Coolidge, the airport and St George.

South to English Harbour

All Saints Road and the south roads to St Paul and St Mary.

Barbuda

Barge or landing craft from St John’s to the jetty near Codrington.

Packing

Packed for two islands

Erection order

Bundles follow the erection sequence, area by area.

Piece marks

Every member marked to the erection drawings before it ships to St John’s.

Bundle lists

A packing list per bundle and a master list per shipment.

Barge-sized bundles

Members and bundles sized for the barge and small cranes on Barbuda.

Who does what

Shipping work, split clearly

World Steel supplies

  • Packing in erection order with piece marks for St John’s
  • Packing lists and shipping documents
  • Wood packaging treated for export to Antigua and Barbuda where used
  • Loading photos for every container
  • Shipment tracking in PEB Studio

The contractor or importer arranges

  • Import clearance and duties
  • Port charges and haulage
  • The sea leg to Barbuda
  • Unloading, storage and cranes on site
  • Erection

Antigua and Barbuda

What we do not claim

Antigua and Barbuda is supplied FOB Vietnam or CIF St John’s only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to St John’s takes about 45 days; the route and costs are confirmed in each quotation.

Products and solutions

The World Steel pages behind this guide

Parish by parish

How this applies in your parish

Antigua and Barbuda has 7 parishes. Open St Philip, Barbuda or St John to see the local wind, ground and coast, the road from St John’s and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Antigua and Barbuda project is cut, welded, inspected and packed.

Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Caribbean logistics

Ports for Antigua and Barbuda: shipped from our plant in Vietnam

Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers

All Caribbean ports and routes

Q&A

What Antiguan and Barbudan buyers ask

Which port does steel for Antigua use?

St John’s Deep Water Harbour. Every project on Antigua is served from there by road.

How does steel get to Barbuda?

It lands at St John’s and goes on by barge or landing craft to Barbuda. We size bundles and members for that leg.

Who clears the steel through customs?

The importer of record in Antigua and Barbuda, usually the contractor or owner, with a customs broker. We supply the commercial documents.

Contact World Steel · Antigua and Barbuda

Talk to us about steel for Antigua and Barbuda

WhatsApp, email or a video call with our engineers, booked at an hour that suits St John’s. Our contact page for Antigua and Barbuda has the ports, the local time and the form.