Why overseas
Why large US contractors send their steel package overseas
Overseas structural steel fabrication is not a bet on price alone. On a large job, four things decide it, and each one grows with the tonnage.
A shop slot when local shops are booked
On a large job the question is often not who is cheapest but who can start. A plant that fabricates 2,500 metric tons a month can take a package that would fill a regional shop for a season.
Shop cost that moves the bid
Fabrication labor and overhead in Vietnam cost less than in a US shop. On a package of thousands of tons, that difference runs through every member you buy.
Mill steel close to the plant
Plate and sections come mainly from large Vietnamese mills such as Hòa Phát, Formosa Hà Tĩnh and POSCO, with Japanese, Korean, Indonesian or Thai steel when your specification calls for it.
Engineering included in the package
Design calculations, value engineering and Tekla shop drawings come with the steel, so your team reviews one coordinated set instead of buying detailing separately.
Large-project capacity
Tonnage we have already fabricated and shipped
Each bar is one job designed, detailed, fabricated and shipped by World Steel from our own plant, which turns out 2,500 metric tons (about 2,750 short tons) of structural steel a month.
The first filter
Make sure you are talking to a fabricator, not a trader
Many overseas offers come from trading companies that place the work with whichever shop has space. Ask the four questions on the right before you open any other file.
How to qualify an overseas steel fabricator
Our prequalification file, filled in for you
These are the questions a US prequalification form asks an overseas fabricator. Pick a tab: each answer links to the record, page or sample document behind it.
Can the plant take a package this size?
Answered-
Monthly fabrication capacity
2,500 metric tons (about 2,750 short tons) of structural steel a month, in World Steel’s own plant at Hai Son Industrial Park, Tay Ninh Province.
Evidence: Inside the plant -
Largest single jobs
Up to 5,000 t on one project (Sunpro Steel, 2024), with several more between 1,000 and 2,500 t.
Evidence: Large-project program -
Heavy and built-up members
Welded plate girders, box and cruciform columns, crane runway girders and laser cutting of plate up to 100 mm (4 in) thick.
Evidence: Built-up sections -
Production slot
Your quote names the production slot and the ship dates for each sequence of your tonnage.
Evidence: How lead time is planned
Who audits the shop, and how often?
Answered-
Third-party accreditation
IAS AC472 since 2019, the first and only accredited fabricator in Vietnam, audited twice a year with IAS experts.
Evidence: IAS AC472 record -
Independent inspection
Smith-Emery, our inspection partner, inspects the plant periodically.
Evidence: Quality program -
Welding quality system
ISO 3834-2 welding quality requirements, certified by Bureau Veritas.
Evidence: Certificates -
What we do not claim
We do not hold AISC certification and never say otherwise. Your building official decides how IAS AC472 applies to your permit.
Evidence: Standards we design to
Will the design pass US plan review?
Answered-
Design basis
Designed to IBC 2024, ASCE 7-22, AISC 360 and AISC 341, or to the code edition and amendments your jurisdiction enforces.
Evidence: Engineering -
Calculations for your Engineer of Record
A full design report and drawings ready for your Engineer of Record’s review and approval. The seal and the permit stay with the US contractor.
Evidence: Sample design report -
Shop drawings
Tekla Structures models and shop drawings for every member, at no extra charge.
Evidence: Shop drawings, included -
Value engineering
Options to take tonnage out, listed for your Engineer of Record to accept or reject.
Evidence: Design optimization
Can every piece be traced to its mill?
Answered-
Grades
ASTM grades as specified, for example A992, A572 and A36 shapes and plate, ordered against your drawings.
Evidence: Structural steel materials -
Mill certificates
EN 10204 type 3.1 certificates traced by heat number to the members they went into, with Charpy V-notch results on request.
Evidence: Mill certificates -
Independent testing
Material tests at ILAC (ISO/IEC 17025) accredited labs, or at the lab you name.
Evidence: Testing labs -
Origin
Mainly Vietnamese mills, with other origins only when the project specification asks for them.
Evidence: Where our steel comes from
Are the welds qualified for seismic work?
Answered-
Procedures
Written WPS backed by PQR records, designed to AWS D1.1, with D1.3 for light-gauge members.
Evidence: WPS and PQR -
Seismic welding
AWS D1.8-qualified procedures and welders for demand-critical welds in seismic force-resisting systems.
Evidence: AWS D1.8 -
Testing
Visual inspection of every weld, with UT, MT and PT where the specification calls for them, recorded by piece mark.
Evidence: NDT program
Can our inspector see the steel before it ships?
Answered-
Inspection and test plan
An ITP agreed for your job: hold and witness points and test rates set by both parties.
Evidence: Sample ITP -
Remote witness
Your special inspector or owner’s representative can witness live over video, with the recording sent afterward.
Evidence: Online factory audit -
Plant visits
You are welcome to audit the plant in person before award or during production.
Evidence: Visit the plant -
Live production records
Every member’s status, from cutting to loading, in PEB Studio, online at any hour.
Evidence: PEB Studio tracking
Will the paint hold up, and can it be touched up in the US?
Answered-
Paint systems
Systems from Jotun, PPG, Carboline, Hempel, Nippon and International Paint, sold worldwide, so touch-up paint is easy to buy in the US.
Evidence: Paint and color submittals -
Applicators
Painters trained and certified by the paint manufacturer; coating inspectors hold FROSIO Level III and BGAS.
Evidence: Coating and corrosion -
Galvanizing
Hot-dip galvanizing to ASTM A123 where specified, arranged with a project-specified galvanizer.
Evidence: Hot-dip galvanizing
How does it cross the Pacific without damage or missing pieces?
Answered-
Packing
Bundles packed and tagged in erection order, with a packing list and photos for every container or breakbulk load.
Evidence: Packing and shipping -
Ports
Shipped from Cai Mep or Cat Lai to the West Coast, Gulf or East Coast port that suits your site.
Evidence: Shipping simulator
How is the money protected?
Answered-
Payment
Payment by Letter of Credit is available, so funds move against shipping documents.
Evidence: Contract and payment -
Incoterm in writing
Every quote states the Incoterm and who acts as importer of record.
Evidence: Incoterms -
One contact
One English-speaking project manager from approval drawings to the last container, and a US office in Westminster, California.
Evidence: Project management
Working day in Vietnam, 8 am to 5 pm local (5 pm to 2 am Pacific Standard Time)
Follow the sun
The time difference works for your schedule
Vietnam is 15 hours ahead of the US Pacific coast in winter and 14 hours ahead in summer. Our working day starts as yours ends, so the hours you are off site are the hours we work on your job.
- United States You send comments, RFIs and approvals at the end of your working day in the US.
- Vietnam Our engineers and the shop in Vietnam start their day as yours ends, with your notes already in the queue.
- United States You start the next morning with answers, revised drawings or a status update in PEB Studio.
Award to jobsite
One chain across two shores, every link with an owner
Most delays on an overseas steel package happen at the handovers, not in the shop or at sea. This is who holds each link on a World Steel job.
-
Vietnam · World Steel
Design and value engineering
Calculations to US codes and the tonnage options, sent to your Engineer of Record.
-
Vietnam · World Steel
Shop drawings
Tekla models and drawings released by erection sequence for approval.
-
Vietnam · World Steel
Fabrication and QC
Cut, welded, coated and inspected in our plant, every member logged in PEB Studio.
-
Vietnam · World Steel
Packing and loading
Bundled in erection order and loaded at the plant, every container photographed.
-
Pacific
Ocean freight
Mainline sailings from Vietnam to the US port named in the quote.
-
United States
Customs and delivery
Cleared and trucked by the party the Incoterm names; the documents are ready before arrival.
-
United States
Erection
Your US contractor sets the steel from our erection drawings and piece marks, with our engineers on call.
Importing fabricated steel
The trade rules, in four folders
Imported structural steel crosses US customs like any other import. We do not quote duty rates on an order; these pages explain the rules from official sources so your team can check them.
-
Section 232 and duties
Imported steel can be subject to US duties. Our Section 232 page explains the rules from official sources only; we never estimate duty on an order.
Section 232 explained -
Importer Security Filing
Ocean shipments need ISF data before loading. We prepare the shipper’s side for every container.
ISF for steel -
US import regulations
Country-of-origin marking, entry documents and the agencies involved in a structural steel import.
Import regulations -
Your own landed cost
Work out freight, duty and fees with your own figures before you compare bids.
Landed cost calculator
World Steel, in Vietnam
What the overseas fabricator carries
- Design calculations to US codes, for your Engineer of Record’s review
- Shop drawings and erection drawings, included
- Material purchasing, mill certificates and traceability
- Fabrication, welding, coating and inspection in our own plant
- Packing in erection order, loading and the shipping documents
The US contractor, our customer
What stays with your team in the US
- Drawing approval, the PE seal and the permit, with your Engineer of Record
- Special inspection required by your building department
- Customs clearance and delivery, as the Incoterm sets out
- Foundations, anchor rods and site work
- Erection of the steel by your US contractor
Questions from US contractors
What GCs ask before they award steel to an overseas shop
Is it risky to use an overseas structural steel fabricator on a US project?
The risk sits in a few places: design to the wrong code, untraceable material, weld quality you cannot see, damage or missing pieces in transit, and unclear import terms. Each one has a control you can check before award: IAS AC472 accreditation, a design report for your Engineer of Record, mill certificates by heat number, remote witness, packing lists per container and the Incoterm in writing.
Is World Steel a fabricator or a trading company?
A fabricator. Your steel is cut, welded, coated, inspected and packed in World Steel’s own plant in Tay Ninh Province, Vietnam, which fabricates 2,500 metric tons a month. Our Westminster, California location is an office, not a shop.
Will steel fabricated in Vietnam be accepted by my building department?
Acceptance depends on the design and the inspection, not on the country. We design to the code your jurisdiction enforces, your Engineer of Record reviews and seals the drawings, and many jurisdictions recognize IAS-accredited fabricators for special inspection. The building official makes the decision for each permit.
Can steel from Vietnam be used on a federal or Buy American project?
Projects with domestic-content rules may restrict foreign steel. Check the contract’s requirements with the contracting officer or owner before you ask us to bid; we do not claim eligibility under any domestic preference program.
Who pays duties and clears customs?
The Incoterm in your quote decides who arranges freight and who acts as importer of record. Duties are set by US law and change over time, so we point you to official sources and never estimate them on an order.
How do we inspect steel that is fabricated on the other side of the Pacific?
Your inspector can visit the plant, witness hold points live over video, or appoint a third-party inspector in Vietnam. Records for every member are in PEB Studio, and the inspection and test plan is agreed for your job before fabrication starts.
Does World Steel erect the steel in the US?
No. World Steel supplies the steel structure only. Erection and field work are the scope of the US contractor, our customer, using our erection drawings and piece marks, with our engineers available for questions from the site.
What size of project is worth sending overseas?
Packages of hundreds or thousands of tons get the most from an overseas plant, because shop cost and capacity count most at that scale. Our largest single job was 5,000 t, and smaller packages are welcome when the schedule allows ocean freight.
Put us through your prequalification
Send your prequalification form or the bid documents. We return the filled form with the evidence, a production slot for your tonnage and a quote with the Incoterm in writing.