Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Painted beams with bolted end plates resting on stands below an overhead crane

Coated beams with end plates welded on, waiting for release in the Vietnam plant.

Download center

Certificates & accreditations for your US project

IAS AC472 accreditation certificates and the quality records behind them, for your submittal and your building official. Download what you need now, request the detailed files, or read them online.

World Steel USA document list: title, issuer and number, validity, format, how to get it
Document Issued by Valid to Format Access Get the document
Certificates & accreditations14 documents
JPG IAS AC472 certificate of accreditation, valid to August 1, 2027 The certificate in force today: Part A and Part C, with Smith-Emery still conducting the plant inspections.
IAS (International Accreditation Service)No. MB-268 JPG · 172 KB · 1 page · English Free download Download View
PDF ISO 9001:2015 certificate, quality management system World Steel's quality management system, audited and found to conform to ISO 9001:2015. Certified since September 2023.
Guardian Independent Certification Ltd (UKAS)No. 786902 PDF · 327 KB · 1 page · English Free download Download View
PDF ISO 14001:2015 certificate, environmental management system World Steel's environmental management system, audited and found to conform to ISO 14001:2015. Certified since September 2023.
Guardian Independent Certification Ltd (UKAS)No. 799559 PDF · 337 KB · 1 page · English Free download Download View
PDF ISO 45001:2018 certificate, occupational health and safety World Steel's occupational health and safety system, audited to ISO 45001:2018. Certified since September 2023.
Guardian Independent Certification Ltd (UKAS)No. 721070 PDF · 331 KB · 1 page · English Free download Download View
PDF ISO 3834-2:2021 certificate, welding quality requirements Welding certification to ISO 3834-2:2021 for steel building fabrication: processes 121 and 136, plate 3 to 40 mm.
GIC Vietnam (Guardian Independent Certification)No. 730264 PDF · 939 KB · 2 pages · English and Vietnamese Free download Download View
PDF EN 1090-1 factory production control certificate, up to EXC3 BSI certificate (Notified Body 2797) for factory production control to EN 1090-1, structural steelwork up to EXC3.
BSI Group The Netherlands B.V. (Notified Body 2797)No. 2797 CPR 827443 No fixed expiry PDF · 364 KB · 2 pages · English Free download Download View
PDF AS/NZS 5131:2016 Benchmark certificate, structural steelwork to CC3 BSI Benchmark certification to AS/NZS 5131:2016 for structural steelwork in buildings and bridges, up to CC3.
BSI Group ANZ Pty LtdNo. BMP 827566 PDF · 268 KB · 2 pages · English Free download Download View
JPG IAS AC472 certificate of accreditation, valid to August 1, 2026 The certificate now lists both sites by address: the plant (Part A) and the design office (Part C).
IAS (International Accreditation Service)No. MB-268 JPG · 173 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2025 The in-plant program now recognized under the 2021 and 2024 IBC as well.
IAS (International Accreditation Service)No. MB-268 JPG · 150 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2024 Fifth certificate in a row, still naming Smith-Emery for periodic plant inspections.
IAS (International Accreditation Service)No. MB-268 JPG · 164 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2023 Another year of audits closed, another renewal from IAS.
IAS (International Accreditation Service)No. MB-268 JPG · 157 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2022 Renewed again, with the program tied to IBC §1704.2.5.1 in the 2015 and 2018 editions.
IAS (International Accreditation Service)No. MB-268 JPG · 147 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2021 Renewed after a full year of audits, with the same Part A and Part C scope.
IAS (International Accreditation Service)No. MB-268 JPG · 117 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2020 The first certificate in the series: Part A fabrication and Part C design under one program number, MB-268.
IAS (International Accreditation Service)No. MB-268 JPG · 80 KB · 1 page · English View online View online
Sample submittal documents4 documents
PDF Sample Inspection and Test Plan (ITP), PEB warehouse Free download: a sample of the ITP World Steel issues with a quotation: every check from shop drawings to packing, with hold, witness and review points for each party.
– – PDF · 129 KB · 5 pages · English and Vietnamese Free download Download View
PDF Sample proposal drawings for a US steel structure Free download: the proposal drawings World Steel sends with a quotation: general notes, plans, elevations and sections.
– – PDF · 12.1 MB · 15 pages · English Free download Download View
PDF Sample Design Calculation Report, US codes with seismic design Read free online: a sample of the Design Report for your submittal, from codes and loads to frame and connection checks. Share your details to download.
– – PDF · 1.7 MB · 31 pages · English Read free, download with details Read Download
PDF Sample approval drawings (APD) for a steel structure Download with your details: a full World Steel approval drawing set for your submittal, 56 sheets from anchor bolts to frames, staircases and mezzanines.
– – PDF · 8.2 MB · 56 pages · English and Vietnamese Download with your details Get the file
Brochures & catalogs1 document
PDF World Steel Group company profile 2026 Free download: who we are, our IAS AC472-accredited plant in Vietnam, standard steel frame systems, materials, quality control and typical projects.
– – PDF · 15.8 MB · 56 pages · English Free download Download View

Certificates & accreditations

IAS AC472 accreditation certificates and the quality records behind them, for your submittal and your building official.

Sample submittal documents

Sample calculation packages, drawing sets, mill certificates and QC records, so your Engineer of Record knows what to expect.

Brochures & catalogs

Company profile, product catalogs and building system brochures for your team and your client.

No document matches this filter.

Ask us for it

For your own building

A full document set, even on a 5,000-ton package

The files here are samples. For your building, World Steel prepares the design calculations, approval drawings and shop drawings, then the mill certificates and QC records as your steel is fabricated in our own plant in Vietnam. Calculations and drawings come ready for your Engineer of Record's review and approval, and you follow production in PEB Studio in real time.

  • 2,500 tfabricated a month in our own plant
  • 5,000 tlargest published job, Sunpro Steel
  • 20,000 m²plant in Tay Ninh, Vietnam
  • 300+people in design, shop and QC

Need a document that is not listed?

Tell us what your client or building official is asking for. We will send the certificate, sample or record that answers it.