Large projects · Cost and risk
Lower cost and lower risk on your largest structural steel packages
On a large job the steel package is one of the biggest lines in the budget and one of the biggest risks to the schedule. We take both down together, from our own IAS AC472-accredited plant in Vietnam.
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Value engineering to US codes
Every ton the code does not need is a ton you never buy, ship or erect.
Our engineers size frames, bracing and connections to the real IBC and ASCE 7 loads for your site before a plate is cut, then list each option for your Engineer of Record to approve.
A deep plate girder going through automatic welding at World Steel, Vietnam.
Fabricated in Vietnam
Vietnamese shop cost on steel built to US codes.
Labor and overhead in our Vietnam plant cost less than in a US shop. On a package of thousands of tons, that difference runs through every girder, column and connection you buy.
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Steel from Vietnamese mills
Plate and sections from mills close to the plant, traced heat by heat.
Most of our steel comes from large Vietnamese mills such as Hòa Phát, Formosa Hà Tĩnh and POSCO, with Japan, Korea, Indonesia or Thailand when your specification calls for it. Short supply chains, fewer surprises.
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Quality you can verify
The quality risk is closed in Vietnam, not discovered on your site.
World Steel is the first and only fabricator in Vietnam accredited under IAS AC472, since 2019, audited twice a year with IAS experts and inspected periodically by Smith-Emery.
Running the automatic beam line from its control panel, World Steel in Vietnam.
Capacity and response
When your site schedule moves, our shop moves with it.
A plant that turns out 2,500 metric tons a month runs several projects in parallel. We confirm your production slot with the quote and re-plan the shop and shipments with you when the job changes.
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Short, direct, in sequence
Direct sailings and erection-order loading keep your cranes working.
Mainline vessels sail direct from Cai Mep to US ports, and many carriers serve the lane. We plan backward from your site date and load the first steel your crew sets in the first containers.
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
PEB Studio
Watch every member move through the shop from your desk in the US.
Cutting, fit-up, welding, coating, QC release, packing and loading appear in PEB Studio as they are signed off, so problems surface in the plant, not when the containers are opened.
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Commercial safeguards
Pay by Letter of Credit, released against the shipping documents.
Your bank opens the L/C and pays when the documents the credit calls for are presented, so neither side carries the whole payment risk. Each quote also names the Incoterm and the importer of record.
We do not publish prices or savings figures: every job is priced on its own drawings. These are the eight places a World Steel package costs less than the usual route.
Cost leverLess steel in the designOur value engineering team sizes frames, bracing and connections to the real US loads for your site, so you do not pay for tonnage the code does not need.Details
Cost leverLower cost per ton fabricatedShop labor and overhead in Vietnam are lower than in the US. We pass that on in the fabricated cost of every member, from built-up girders to secondary steel.Details
Cost leverMill steel close to the plantMost of our plate, coil and sections come from Vietnamese mills such as Hòa Phát, Formosa Hà Tĩnh and POSCO, with Japan, Korea, Indonesia or Thailand when your specification calls for it.Details
Cost leverShop drawings includedShop drawings and erection drawings come with every project at no extra charge, so detailing is not a separate contract on your budget.Details
Cost leverFewer containers to pay forMembers are designed and split to fit standard containers and packed tight, so you ship steel, not air.Details
Cost leverFewer hours of field fixesLaser-cut plates and holes and fit-up checked against the shop drawings mean your erector bolts up instead of cutting and re-drilling on site.Details
Cost leverA shorter job on siteSteel that arrives on time and in erection order cuts idle time from your general conditions, cranes and crew costs.Details
Cost leverA landed cost you can checkEvery quote names the Incoterm and the importer of record. Our calculator lets you build up freight, duties and fees yourself before you sign.Details
Lower risk
The risk register for an imported steel package, closed out
These are the risks a US project team raises when the steel comes from overseas. Next to each is what it costs when it happens and the control World Steel puts in place.
Impact ↑Controlled
Likelihood →
Code, quality, capacity, shipping, customs and payment risks, each closed by a control you can check below.
Risk
What it costs you
How World Steel closes it
Detail
Steel designed to the wrong code
ExposureRejected submittals, redesign and a stalled permit.
ControlDesign to IBC, ASCE 7 and AISC 360 with the US loads for your site. Calculations and drawings go to your Engineer of Record for review and approval.
ExposureCranes and crews standing idle on your site.
ControlShipping planned backward from your site date, bundles packed in erection order, and direct mainline sailings to West, Gulf and East Coast ports.
ControlUL-certified coating products from Jotun, PPG, Carboline, Hempel, Nippon and International Paint, applied by painters trained and certified by the paint maker. The same brands are sold in the US for touch-up.
ControlOne fabricator for design calculations, shop drawings, fabrication, coating, packing and shipping, with a written split of what your team keeps.
Every week the steel is late, the GC pays for cranes, crews and site overheads. Speed comes from three places: the shop, the way we respond and the shipping lane.
Fabricate fast
Photo
Capacity is what keeps a large package on schedule. Our plant is laid out for volume, not for one job at a time.
2,500 metric tons (about 2,750 short tons) a month
Laser cutting and hole-making in plate up to 100 mm (4 in) thick
Automatic beam welding lines for built-up members
Several projects in the shop in parallel
Respond fast
Photo
Large jobs move. When your site schedule changes, we re-plan the shop and the shipments with you instead of holding to an old sequence.
Production slot confirmed with the quote
Drawings, fabrication and shipments released in sequences
Live progress and changes visible in PEB Studio
One project manager from award to the last container
Ship short and direct
Photo
Vietnam to the US is a busy, well-served trade lane. Containers leave from the deep-water port at Cai Mep or from Cat Lai.
Mainline vessels direct from Cai Mep to US ports
Many carriers to choose from for each sailing
West, Gulf or East Coast port picked for your site
Loaded in erection order, every container photographed
You order the building. We take care of the shipping.
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
The best-fit route to your site
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
Customs paperwork ready early
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
Loaded in erection order
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
One team that knows the US
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Every container live in PEB Studio
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Quality you can audit
A quality system built for US inspectors
High quality on a large job is not a promise; it is a system that runs the same way on every member, with records your inspector and the owner can check.
IAS AC472 since 2019Accredited for design and fabrication of metal building systems and audited twice a year with IAS experts.
ISO 3834-2 welding qualityFusion welding certified to the comprehensive quality level of EN ISO 3834-2.
An ITP agreed for your jobInspection items, hold points and sampling rates are agreed between both parties for each project.
Your inspector, remotelyThird-party or owner inspectors can be given remote access to hold points on request.
Records you can submitMill certificates, weld and coating records and release reports collected member by member.
Nonconformance under controlAnything out of tolerance is tagged, held and closed out before it can be packed.
Photo
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Photo
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Photo
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Buying steel from overseas should not mean paying in the dark. These are the commercial safeguards on a World Steel contract.
Letter of Credit
Pay through an L/C opened by your bank. The money is released against the shipping documents the credit calls for, so neither side carries the whole payment risk.
The Incoterm you need
FOB, CFR, CIF and DAP are quoted every day; DDP is considered case by case. Each quote names who is importer of record.
Design calculations and drawings for your Engineer of Record
Shop drawings and erection drawings, included
Fabrication, welding and coating in our own plant in Vietnam
Inspection and test plan, quality records and mill certificates
Packing in erection order and shipping to your US port
Engineering support for your erector by phone and video
The US contractor, our customer
What stays with your team
Drawing approval and the PE seal by your Engineer of Record
Building permit and special inspections
Foundations, anchor bolts and site work
Customs clearance through your broker, unless the quote says otherwise
Erection by your own or your chosen crew
The contract with the owner
Questions from US contractors
Cost and risk questions we hear before award
How does World Steel lower the cost of a large structural steel package?+
In four places: less steel through value engineering to US codes, a lower fabricated cost per ton in Vietnam, mill steel sourced close to our plant, and shop drawings included at no extra charge. Shipping in erection order then shortens the time your crew and cranes spend on site.
Do you publish prices or savings figures?+
No. Every job is priced on its own drawings, specification, tonnage and delivery terms. Send the bid documents and we quote the package, with the Incoterm and the importer of record stated.
How do you reduce quality risk on a job fabricated overseas?+
The plant is IAS AC472-accredited and audited twice a year with IAS experts. Each project has an inspection and test plan agreed with you, your inspector can have remote access to hold points, and every member’s records are in PEB Studio.
Can you hold our schedule on a large job?+
The plant fabricates 2,500 metric tons a month with several projects in parallel. We confirm the production slot with the quote and release drawings, fabrication and shipments in the sequences your erector needs.
What payment terms do you accept?+
We work with payment by Letter of Credit, so funds are released through the banks against the shipping documents the credit requires. Other terms are agreed in the contract for each project.
Who seals the drawings and erects the steel?+
Your Engineer of Record reviews, approves and seals the drawings, and your team or chosen erector sets the steel. World Steel designs, details, fabricates, coats, packs and ships the steel structure.
Where does the steel come from?+
Mainly from Vietnamese mills such as Hòa Phát, Formosa Hà Tĩnh, POSCO, Hoa Sen and Nam Kim, with steel from Japan, Korea, Indonesia or Thailand when the project specification calls for it. Every heat is traced to its mill certificate.
How do imports and duties affect the cost?+
Imported steel can be subject to US duties such as Section 232. Each quote states the Incoterm and who acts as importer of record, and our landed cost calculator lets you build up freight, duties and fees for your own estimate.
Send the bid documents, the tonnage and the bid date. Our engineers look for the tonnage we can take out, confirm the production slot we can hold and quote the package with the Incoterm and payment by Letter of Credit.