Sample submittal documents
Sample proposal drawings for a US steel structure
Free download: the proposal drawings World Steel sends with a quotation: general notes, plans, elevations and sections.
PDF · 12.1 MB · 15 pages · English
This is a sample filled in with demonstration data for a pre-engineered warehouse (document WS-QAC-QITP-0001, revision 00, English and Vietnamese). It shows the layout and the checks: shop drawing review, incoming material, welding procedures and welder qualification, cutting, fit-up, visual and dimensional inspection, NDT, blasting and painting, packing and the manufacturing data record, with a column for World Steel, the main contractor, the client or consultant and a third party. On a real project, the inspection items and the inspection rates are agreed by both parties for that project and written into your project ITP before fabrication starts.
Sample submittal documents
Sample submittal documents
Free download: the proposal drawings World Steel sends with a quotation: general notes, plans, elevations and sections.
PDF · 12.1 MB · 15 pages · English
Sample submittal documents
Read free online: a sample of the Design Report for your submittal, from codes and loads to frame and connection checks. Share your details to download.
PDF · 1.7 MB · 31 pages · English
Sample submittal documents
Download with your details: a full World Steel approval drawing set for your submittal, 56 sheets from anchor bolts to frames, staircases and mezzanines.
PDF · 8.2 MB · 56 pages · English and Vietnamese
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.