Quote to warranty · Material and color submittals

Material and paint color submittals: approved by you before we buy a ton of steel

Steel grades, mill certificates, coating systems and color samples go to you after the approval drawings. Plate, sections and paint are ordered only against the approved submittal.

What we submit

Six parts of the material and color submittal

It follows the approval drawings, so every grade and coating matches the design your Engineer of Record approved.

  • Submittal sheet Steel grades by member typeEach member type with its grade and producing mill, checked against the grades your drawings and specification call for.
  • Submittal sheet Sample mill certificatesExamples of the EN 10204 3.1 mill certificates you will receive, with Charpy impact results where your specification asks for them.
  • Submittal sheet Coating system dataProduct data sheets for each coat, the surface preparation standard and the dry film thickness per coat and in total.
  • Submittal sheet Color samplesColor cards from the paint maker, or a match to the color code your architect specifies, for your owner to sign off.
  • Submittal sheet Bolts and accessoriesBolt grades and finishes, washers and any accessories in the package, listed with their standards.
  • Submittal sheet Inspection pointsThe incoming-material and coating checks that will appear in the inspection and test plan.

The approval gate

Your approval comes before our purchase order

Steel and paint are bought once, to the approved grade, size and color, then checked again when they reach the plant.

  1. We submitThe submittal follows the approval drawings, so grades and coatings match the approved design.
  2. You approveYou, your Engineer of Record or your owner approve grades, the coating system and colors, or send comments.
  3. We purchasePlate, sections and paint are ordered only against the approved submittal, once, to the right grade and color.
  4. We check at intakeEvery heat is checked against its mill certificate and traced to the members cut from it.

Where the steel comes from

Mainly large Vietnamese mills, with Japan, Korea, Indonesia or Thailand when your specification calls for it. The submittal names the mill for each grade.

  • Hòa Phát
  • Formosa Hà Tĩnh
  • POSCO
  • Hoa Sen
  • Nam Kim
Plate and coil strip racked by grade and heat number in the store Photo
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Members in gray finish paint laid out in the paint hall Photo
Gray finish coat applied in the Vietnam paint hall.

Paint brands

Coating products your crew can buy in the US

UL-certified products from six international paint makers, applied by painters trained and certified by the manufacturer.

Finish coats you can match anywhere

Six international brands, one color matched on site

Our polyurethane finish coats come from worldwide paint brands. When a member is scuffed in transit or during erection, the US contractor can buy the same product and color locally, so the touch-up matches and the coating system stays one manufacturer’s system.

  • JotunNorway
  • PPGUnited States
  • CarbolineUnited States
  • HempelDenmark
  • Nippon PaintJapan
  • International PaintUnited Kingdom
Bought near the jobSold through each brand’s US distributors.
Same product, same colorNamed on the coating schedule we send.
Certified paintersTrained and certified by the paint manufacturer.

Brand names are trademarks of their owners and are named only to show the coating systems we apply. No partnership or endorsement is implied. The product on each project is the one named in its coating schedule. Surface preparation follows SSPC standards, read with the paint data sheet.

Questions from US contractors

Material and color submittals: questions we hear

Why is steel not bought before the drawings are approved?

Because grades, sizes and quantities come from the approved design. Ordering once, to the approved design, avoids surplus stock and wrong grades.

Can you use steel from mills outside Vietnam?

Yes. Most steel comes from large Vietnamese mills, and we source from Japan, Korea, Indonesia or Thailand when the project specification calls for it.

Do we get mill certificates for every heat?

Yes. EN 10204 3.1 mill certificates come with the steel, Charpy results on request, and every heat is traced to the members cut from it.

Which paint brands do you use?

Jotun, PPG, Carboline, Hempel, Nippon or International Paint, chosen to match your specification. All are sold in the US, so touch-up paint is easy to buy near the job.

Can you match a specific color?

Yes. Send the color code your architect specifies, or choose from the paint maker’s color cards, and we submit the sample for approval before purchasing.

Who applies the coating?

Our own painters, trained and certified by the paint manufacturer, in the paint hall of our plant in Vietnam.

Talk to us about material and color submittals

Send your drawings, your site and your target date. A World Steel sales engineer walks you through each stage of the job.