Quote to warranty · Contract and payment

Contract and payment for your structural steel package, agreed before a plate is cut

The contract fixes the drawings it is based on, the scope split, the delivery sequence, the change rules and how payment moves, so the job that follows runs on written terms, not assumptions.

What the contract fixes

Eight clauses that keep a steel package on track

Every one of these is settled in writing before signing. Together they decide how changes, deliveries and payments are handled for the rest of the job.

Steel supply contract · Main terms

Basis documents

The drawings, specification and addenda the price is based on, listed by number and revision, so a later revision is a visible change and not an argument.

Scope split

What World Steel supplies (design calculations, drawings, fabrication, coating, packing, shipping per the Incoterm) and what stays with your team (approval and seal, permit, foundations, customs clearance, erection).

Submittal and delivery sequence

The dates approval drawings are issued and must come back, and the order in which sequences are fabricated and shipped to suit your erection plan.

Delivery terms

The Incoterm and named port, who books the freight, where the risk passes and who acts as importer of record for US customs.

Inspection rights

The inspection and test plan to be agreed, your right to witness hold points in person or by video, and third-party inspector access on request.

Changes

How a change is requested, priced and approved in writing before the shop re-sequences, so cost and schedule effects are agreed first.

Payment

The advance payment, the payment method (including payment by Letter of Credit) and the documents each payment is released against.

Warranty

The warranty terms for the steel structure supplied, and how a claim is reported, traced and answered.

From discussion to locked slot

Three stages between your award and the first drawing

Short stages, but they set the rules for the whole job.

  1. Contract discussion

    Clause by clause, with your contract form or ours. Open points from the quote are closed in writing.

    In the full process
  2. Contract signed

    A named project manager takes over from sales, a kickoff call sets the baseline schedule and your team gets PEB Studio access.

    In the full process
  3. Advance payment

    The advance agreed in the contract is paid, or the Letter of Credit is opened, and the production slot is locked.

    In the full process

Payment by Letter of Credit

How an L/C moves the money on an imported steel package

The banks stand between buyer and seller: payment is made only when the shipping documents the credit calls for are presented and comply.

  1. Your bank opens the creditYou apply to your bank, which issues a Letter of Credit in World Steel’s favor with the documents and dates agreed in the contract.
  2. The credit is advised to usOur bank in Vietnam checks the credit and confirms it to World Steel. We check that every condition can be met before production starts.
  3. We fabricate and shipThe steel is fabricated, inspected, packed and shipped as the contract says.
  4. We present the documentsWe hand the shipping documents the credit calls for to our bank, which sends them to yours.
  5. The banks check themYour bank checks the documents against the terms of the credit. Payment is made only when they comply.
  6. You receive the documentsThe documents are released to you, and your broker uses them to clear the cargo.

Documents a credit usually calls for

  • Commercial invoice
  • Packing list
  • Bill of lading
  • Certificate of origin
  • Mill certificates or an inspection report, if the credit asks for them

The exact list, dates and charges are agreed in the contract and written into the credit. This is general information, not banking or legal advice.

Questions from US contractors

Contract and payment: questions we hear

Can we use our own contract form?

Yes. We review your form clause by clause and send our comments. Where a clause does not fit an overseas fabricator, such as site safety or erection, we propose wording that matches our scope.

How much is the advance payment?

It is agreed in each contract, together with the payment method and the documents each payment is released against. We do not publish standard percentages.

Why pay by Letter of Credit?

Funds are released by the banks only against the shipping documents the credit calls for, so you do not pay for steel that has not shipped and we do not ship without secured payment.

Who pays the bank charges for the L/C?

That is agreed in the contract. Usually each side pays its own bank’s charges.

What happens if the drawings change after signing?

The change is logged, its effect on cost and schedule is sent to you in writing, and the shop re-sequences once you approve it.

Does the contract cover erection?

No. World Steel supplies the steel structure. Erection is by your own crew or the erector you hire, with remote support from our engineers.

Talk to us about contract and payment

Send your drawings, your site and your target date. A World Steel sales engineer walks you through each stage of the job.