What backs the warranty
Six links of traceability behind every member
The warranty terms are written in your contract. What makes them work is a record for every member, from the mill heat to the container it shipped in.
- HeatEach plate and section traced to its mill certificate at intake.
- MemberEvery piece cut from a known heat carries its own piece mark.
- WeldWelds made to qualified procedures by identified welders, inspected to the agreed plan.
- CoatingSurface preparation and dry film thickness recorded for each member.
- BundleEach member packed into a listed bundle.
- ContainerEach bundle loaded into a photographed, sealed container.
If something is wrong
How a warranty claim is handled
Five steps, each answered in writing, under the warranty terms of your contract.
- Report itSend photos, the piece mark and a short description to your project manager.
- We trace itThe member’s records show its heat, welds, inspections, coating and shipment.
- We find the causeOur engineers and quality team review the records and the photos, and ask for more if needed.
- We agree the remedyThe remedy is agreed with you in writing, under the warranty terms of your contract.
- We close itThe claim is closed in writing, and any lesson goes back into our shop procedures.
Care after erection
Four habits that keep the structure as delivered
Coating warranties follow the paint manufacturer’s own terms, and the brands we use are sold in the US for touch-up and maintenance.
- Inspect after erectionLook for coating damaged during handling and erection, and touch it up with the specified product.
- Use the specified productsTouch-up and maintenance coats from the same paint maker keep the coating system consistent.
- Keep connections as designedDo not cut, drill or weld the structure without your engineer’s approval.
- Keep the recordsFile the quality records and drawings with the building documents for the owner.
Questions from US contractors
Warranty: questions we hear
How long is the warranty?
The warranty terms are written in each contract for the steel structure supplied. We do not publish a standard period on the website.
What does the warranty cover?
The steel structure World Steel supplied, as set out in the contract. Erection, foundations and site work are outside our scope and are covered by whoever performed them.
How are coating warranties handled?
Coating warranties follow the paint manufacturer’s own terms. The brands we use are sold in the US, so warranty questions go to a manufacturer close to the job.
How do we make a claim?
Send photos, the piece mark and a description to your project manager. The claim is traced through the member’s records and answered in writing with the cause and the agreed remedy.
Why do the records matter?
Because every member is traced to its heat, welds, inspection and coating record, the cause of a problem can be found quickly and fairly.
Can the owner get the quality records?
Yes. The quality records and drawings are handed over with the job, so you can pass them to the owner at closeout.