What your erector gets
The erection kit that travels with your steel
Everything your crew needs to set the steel in the right order, from the same 3D model the shop fabricated from.
- Erection drawingsPlans and elevations with every piece mark, connection details and the erection sequence.
- Anchor rod planIssued with the approval drawings, so the foundations are poured to the same grid.
- Bolt listsBolt grade, size, length and quantity for each connection, packed and labeled to match.
- Packing list by piece markEvery bundle and container listed by piece mark, in the order your crew will set the steel.
- PEB Studio accessDrawings, records and shipment status in one place for your site team.
- Quality recordsMill certificates, weld and coating records for your special inspector.
When the steel arrives
An arrival checklist for your site team
Short or damaged items are rare, but when they happen, a same-day report keeps the fix fast.
- Unload and countCheck each bundle against the packing list as it comes off the truck.
- Photograph damagePhotograph any damaged coating, bent member or broken strap before it is moved.
- Tell your project managerSend the photos and piece marks the same day. Short or damaged items are traced by bundle and container.
- Replace or repairThe fix is agreed with you and tracked to closure, by replacement in a later shipment or a repair method approved by your engineer.
Remote support
The engineers who detailed your steel, a call away
Site questions are answered against the 3D model, at the start or end of your US day.
- Video callsZoom or Microsoft Teams with the engineers who detailed your steel, at the start or end of your US day.
- Hotline and WhatsAppPhotos and questions straight from site, answered against the 3D model.
- Site RFI logEvery site question gets a reference, an owner and a written answer.
Questions from US contractors
Erection support: questions we hear
Does World Steel erect the steel?
No. World Steel designs, fabricates, coats, packs and ships the steel structure. Your crew or the erector you hire sets it, with our engineers supporting them remotely.
Can your engineers come to site?
Support is by phone and video, which covers almost every site question. A site visit can be discussed for a specific project.
What if a member does not fit?
Send photos and the piece mark to your project manager. We check it against the shop drawing and the 3D model and agree the fix with you and your engineer.
How is the steel packed for erection?
Bundled in erection sequence and tagged by piece mark, with a packing list per bundle and container, so your crew unloads in the order it builds.
Who does the special inspections on site?
Your special inspector, under your permit. We provide the shop quality records they need.
What should we do with coating damage from erection?
Touch it up with the same product named in the coating submittal. Because the brands we use are sold in the US, the product is easy to buy near the job.
Talk to us about erection support
Send your drawings, your site and your target date. A World Steel sales engineer walks you through each stage of the job.