A real World Steel Design Calculation Report for an elevated steel parking deck with a ramp, 28 m wide and 82 m long (92 ft by 269 ft), stamped SAMPLE, with the project name, job number, location and the engineers' initials removed. The structure is a special moment frame designed for a high seismic zone (R = 8, zone 4), with deck live load 2.4 kN/m² (50 psf) and ramp dead load 4.8 kN/m² (100 psf).
It shows the layout of every World Steel Design Report: the codes applied (ASCE 7-10, AISC 360-10 LRFD, AISC 341-10, AISC 358-10 prequalified moment connections, AISI S100-12, AWS D1.1, IBC 2015 and MBMA 2012), material grades, design assumptions, load combinations and deflection limits, the analysis model with dead, live and earthquake loads, member stress ratios, vertical deflection and seismic drift checks, then the anchor bolt and base plate design and the extended end plate moment connections with every limit state and its code reference.
On your project, the Design Report and the approval drawings go to your Engineer of Record for review and approval. The seal and the permit stay with the US contractor, our customer, and their engineer.