Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Long factory building framed with red tapered portal frames and roof purlins

World Steel job in Vietnam (Tay Ninh Province): tapered portal frames.

Sample submittal documents

Sample proposal drawings for a US steel structure

Free download: the proposal drawings World Steel sends with a quotation: general notes, plans, elevations and sections.

Sample proposal drawings for a US steel structure

A real proposal set from a US steel structure project, with the project name, number and location removed. It shows what you receive with a World Steel quotation: the drawing list, general notes (materials and ASTM grades, deflection criteria, code basis IBC 2018, ASCE 7-16 and AISC 360-16, design loads), floor and framing plans, the roof deck plan with its gravity load legend, four elevations and typical cross sections. Proposal drawings show the scope the price covers; after the contract, the approval drawings (APD) and Design Report go to your Engineer of Record for review, approval and seal, and shop drawings follow at no extra charge.

File
PDF, 12.1 MB
Pages
15
Language
English
Category
Sample submittal documents
Access
Free download

Sample submittal documents

More in this category

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.