Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Welder beside a deep built-up girder running through the automatic line

A deep plate girder going through automatic welding at World Steel, Vietnam.

Sample submittal documents

Sample approval drawings (APD) for a steel structure

Download with your details: a full World Steel approval drawing set for your submittal, 56 sheets from anchor bolts to frames, staircases and mezzanines.

Sample approval drawings (APD) for a steel structure

A real World Steel approval drawing set (APD, revision 02) for two steel warehouses, 58 m by 150 m and 42 m by 150 m (190 ft by 492 ft and 138 ft by 492 ft), with mezzanines at +3.20 m and +8.00 m. The project name, location, quote and job numbers and the engineers' names are removed, and each sheet carries a small SAMPLE stamp.

The 56 A3 sheets show what your Engineer of Record receives for review: the drawing index and general notes (IBC 2015, AISC 360-10, AISI S100-12, ASCE 7-10, MBMA 2012 and AWS D1.1, design loads, deflection limits, materials and weld tables), the anchor bolt plan and details, column reactions for each building, cross sections, endwall, fascia, roof and sidewall framing, longitudinal bracing, seven staircases, mezzanine beam plans and decking plans.

Approval drawings follow the contract: your Engineer of Record reviews and approves them, the seal and the permit stay with the US contractor, our customer, and shop drawings follow at no extra charge. Questions on any sheet? Victor's WhatsApp QR code is at the top of every page. The file is about 8.6 MB, so it is offered as a download.

File
PDF, 8.2 MB
Pages
56
Language
English and Vietnamese
Category
Sample submittal documents
Access
Download with your details

Sample submittal documents

More in this category

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.