Shop drawings, in brief
Drawn for the plant, at no extra charge
Shop drawings are how the approved design reaches the plant floor in Vietnam. They are generated from the Tekla model and checked against the Design Report before release, and they are included on every project whether we designed the steel or fabricate to your engineer’s design.
Everything about our shop drawingsAssembly drawings
Every welded member with its plates, holes, welds, camber and coating, as the plant fabricates it.
Single-part drawings
Each plate, clip and stiffener on its own sheet, with the data the CNC machines cut and drill from.
Inspection marks
Weld symbols and dimensions our quality team checks against before a member is released.
The erection set
What your crew receives before the steel lands
Erection drawings are written for the people on the site: the surveyor setting rods, the foreman planning crane picks and the connector at height with a bag of bolts.
The final, approved rod layout with projections and the column each pattern belongs to, for the survey crew before the steel arrives.
Every piece mark drawn on its gridline in plan, roof and wall elevation, so a member is found by its mark rather than by measuring.
Each frame type with its column, rafter and connection marks, splice locations and bolt groups.
Diameter, grade, length and quantity of bolts at each connection, with the joint type: snug-tight or pretensioned under the RCSC Specification.
Which bays carry the permanent bracing, how rods are tensioned and where frames are plumbed before the secondary steel goes on.
Purlin and girt marks, lap positions, flange braces and sag rods, bay by bay.
Panel runs, sidelap direction, fastener patterns by roof and wall zone, and trim details, when the envelope is in our scope.
Which container or lot each piece mark is in, so the yard crew unloads to the zone where it is needed.
Sequence
From the braced bay outward
A steel building is stable only once its bracing is in. The erection drawings therefore start where the permanent bracing is, and the rest of the frame grows out from there. Shipping lots follow the same zones, so the first containers to arrive hold the first steel to go up.
Braced starter bay
The first two frames, their bracing and the eave struts. Plumbed and braced, it becomes the reference for everything else.
Infill bays
Frames set outward from the starter bay, tied back with purlins and girts as each one goes up.
End walls and openings
End wall columns, wind columns and framed openings once the main frames are aligned.
Envelope
Roof and wall sheeting, trims and gutters, working from the braced bay out.
Piece marks follow the steel
One mark from drawing to label to container to site
The piece mark on the erection drawing is the same mark printed on the label on the steel, listed in the packing list and recorded in PEB Studio. Scan the label on site and the member shows up in the model, with its drawing, its inspection record and the container it traveled in.
World Steel does not erect. Erection, cranes, temporary bracing and erection engineering stay with the US contractor, our customer, and their erector, as the AISC Code of Standard Practice sets out. What we give the crew is information that is complete, consistent and easy to find, plus a team that answers remotely against the model.
Designed out before shipping
Four field problems the drawings are built to prevent
Holes come from the same model as the drawings and the machine files, and fit-up is checked in the plant before coating.
Bolts are listed by connection and packed by connection, so a crew does not sort mixed kegs at the top of a ladder.
Piece marks are on the drawing, on the label and in the packing list, and the container list says where each one traveled.
Connections are bolted wherever the design allows, and any field weld is shown on the erection drawing with its procedure.
Who owns this step
Clear lines between our scope and yours
World Steel designs and fabricates the steel structure. Approval, the PE seal, the permit and the erection stay with the US contractor and the Engineer of Record they appoint.
World Steel
Designs, details and fabricates the steel in Vietnam
Details every assembly and connection, issues the shop drawings to the plant and the erection drawings to your crew, and answers questions remotely against the model.
Your Engineer of Record
Reviews, approves and seals for your permit
Reviews the shop drawings where the contract asks for it, and confirms any field change to the structure.
The US contractor, our customer
Submits, builds the foundations and erects
Plans and carries out erection with its own crew and cranes, designs and installs temporary bracing, and requests remote support from our team when it needs it.
Questions from US contractors
Questions about shop and erection drawings
Do shop and erection drawings cost extra?
No. They are included on every World Steel project at no extra charge, whether we design the steel or fabricate to your engineer’s design.
When does my erector get the erection drawings?
Before the steel is shipped, together with the packing lists, so the crew can plan cranes, laydown and sequence while the containers are at sea.
Does World Steel erect the steel or supervise the site?
No. Erection, cranes and temporary bracing are the scope of the US contractor, our customer, and their erector. Our team answers questions remotely against the model and the drawings.
Who designs the temporary bracing?
The erector, as the AISC Code of Standard Practice sets out. Our erection drawings show the permanent bracing and the sequence the design assumes, which their plan builds on.
Which bolts need to be pretensioned?
The bolt list says so for every connection. End-plate moment connections and some bracing joints are often pretensioned; many others are snug-tight. The joint type follows the design and the RCSC Specification.
What if a piece arrives damaged or short?
Report it with the piece mark and a photo through PEB Studio or your project manager. The mark tells us exactly which drawing, batch and container it belongs to.