Design step: Tekla model and BIM

The approved design, built once in 3D before it is built in steel

Once the approval drawings are signed off, our detailers model the steel in Tekla Structures: every member, plate, bolt and hole. An IFC file goes to your architect and MEP trades to check for clashes, and the same model then drives the drawings, the CNC machines and the tracking in PEB Studio.

IFC model of a steel building in the PEB Studio model viewer, members colored by production status
PEB Studio model viewer: the same model your team coordinates with tracks every member through the plant.

Built layer by layer

How the steel model goes together

The model is built in the same order the building is: shared coordinates first, then the frame, then everything that hangs on it. Each layer comes from a document you have already approved.

Grids and levels

Gridlines, floor and roof levels and slab edges, set once so every trade shares the same coordinates.

From: Architect’s IFC or DWG

Primary steel

Columns, rafters, beams and frames with the sizes, tapers and haunches of the approved revision.

From: Approval drawings

Connections

End plates, splices, stiffeners, clips and base plates built to the connection design, with every bolt and weld placed.

From: Design Report

Secondary steel and bracing

Purlins, girts, eave struts, flange braces, sag rods and bracing, including laps and their bolt patterns.

From: Approval drawings

Openings and framed openings

Doors, windows, louvers and roof penetrations with their jambs, headers and support framing.

From: Architect and MEP engineers

Envelope, when in scope

Roof and wall sheeting, trims, gutters and closures, so quantities and fastener patterns come from the model too.

From: Scope letter

Piece marks

One unique mark for every assembly, carried onto the drawings, the label on the steel and the record in PEB Studio.

From: Model numbering

Clash review

Six clashes we look for before a single shop drawing is issued

IFC files go out to your architect and MEP trades at agreed checkpoints. Their models come back, the clash run is reviewed and every hit is logged with an owner until it is closed in the model or by an RFI.

ClashWhat we checkUsual fix
Ducts and sprinkler mains against purlins and flange braces Clear space under the roof steel for the MEP runs. Move a flange brace, raise the duct or frame a passage.
Rooftop units against purlin lines Curb footprints and their support framing. Add framed openings or shift the unit to a bay that suits it.
Overhead doors against girts and bracing Door heads, guides and operators in the wall plane. Relocate bracing or use a portal frame in that bay.
Crane clearance against roof steel and lights Hook height, crane bridge and trolley envelope. Adjust haunch depth, lights or runway level.
Stairs and mezzanines against columns Headroom and clear width at stair runs and landings. Turn the stair or reframe the mezzanine edge.
Downspouts against columns and base plates Drainage path down the wall to the site system. Move the downspout or the bracing bay.

From model to machine

The model does not stop at the office door

In our plant in Vietnam the Tekla model is the source of production data, not a picture of it. That is why a change only counts once it is in the model.

CNC files

Cutting and drilling data for every plate and section goes straight from the model to the shop machines, including laser cutting and hole-making in plate up to 100 mm (about 4 in) thick.

Material lists

Plate, section, bolt and hardware quantities, used for purchasing and checked against the steel that arrives.

Shop drawings

Assembly and single-part drawings generated from the model, so drawing and machine file never disagree.

Tracking in PEB Studio

The IFC model in PEB Studio colors each member by status, from cut to fabricated, inspected, packed and shipped.

What you can ask for

Model deliverables, set at kickoff

At kickoff we agree the IFC version, the exchange checkpoints and the reports your team wants: material lists, bolt lists, member weights by area or by shipping lot. Drawings come as PDF for review and can be exported to DWG.

Our fabrication model is detailed enough to make every part from it. A contractual level of development is only claimed when your contract defines one and we agree it in writing. You keep the IFC model and the drawings for the life of the building; terms for the native Tekla file are set in the contract.

BIM and Tekla standard
Red multi-story process tower frame next to a feed mill Photo
Process tower frame by World Steel in Vinh Long Province, Vietnam.

Who owns this step

Clear lines between our scope and yours

World Steel designs and fabricates the steel structure. Approval, the PE seal, the permit and the erection stay with the US contractor and the Engineer of Record they appoint.

World Steel

Designs, details and fabricates the steel in Vietnam

Builds and checks the Tekla model, exchanges IFC files, logs and resolves clashes in the steel, and keeps the model in step with every approved change.

Your Engineer of Record

Reviews, approves and seals for your permit

Decides on clashes that affect the structure or the design intent, and approves any change to the steel that comes out of coordination.

The US contractor, our customer

Submits, builds the foundations and erects

Brings the architect and MEP trades into the clash review, sends their models in IFC and settles which trade moves when two systems collide.

Questions from US contractors

Questions about the Tekla model

When does the Tekla model start?

After the approval drawings are signed off. On large jobs, areas whose approval is complete can be modeled while other areas are still in review.

How often do we get an IFC file?

At the checkpoints agreed at kickoff, typically before shop drawings are issued and after any change that moves steel. Extra exchanges can be added on busy coordination jobs.

Which IFC version do you export?

IFC4 or IFC2x3, whichever your coordination software reads best. Tell us at kickoff and every export follows it.

Can you model our embeds and anchor rods?

Anchor rods are modeled with the steel. Embeds and concrete belong to their designers, but can be shown in the model as references so connections line up.

Who checks the connections in the model?

Our detailers build them to the connection design, and the project engineer checks the model against the Design Report before shop drawings are issued.

Is the model updated after a change?

Always. A change goes into the model first, and the drawings, CNC files and IFC export are regenerated from it under a new revision.