QC checkpoint: fit-up

The weld is decided before the arc is struck

Most weld defects start as fit-up defects: a root opening too wide, a bevel too shallow, a plate out of line. So every assembly is checked after it is tacked and before it is welded out, against the shop drawing and the welding procedure, and it does not move on until the check is signed.

root opening root face groove angle alignment of both parts backing, tight to both parts
A complete-joint-penetration groove joint as fitted, before welding. The root opening is held to 3 mm (1/8 in) or the WPS value.

At the joint

Six things checked on every fitted joint

Each is measured against the welding procedure for that joint and the shop drawing, and the limit comes from a written source, not from the fitter’s eye.

Root opening

The gap at the root of a complete-joint-penetration groove weld is no more than 3 mm (1/8 in), or the opening the WPS states.

WPS and AWS D1.1 joint tolerances

Root face

The land left at the root suits the process and the backing, so the root fuses without burning through.

WPS joint detail

Groove angle

The bevel is cut to the angle in the WPS, giving the welder room to reach the root and fuse the sidewalls.

WPS joint detail

Alignment

Abutting parts line up, so loads pass through the weld as designed rather than around an offset.

AWS D1.1 alignment limits

Backing

Steel backing, where used, is continuous and tight to the parts, with no gap that could trap slag.

AWS D1.1 and the WPS

Cleanliness

Joint faces are free of loose mill scale, rust, oil, paint and moisture before welding.

AWS D1.1 surface preparation

AISC 360, Chapter N

The checklist the US code sets before welding

AISC 360 lists inspection tasks to perform before, during and after welding. These are the ones that fall before the arc is struck, and they are what our QC inspector works through at fit-up.

Prior to welding

  • The WPS for the joint is available at the workstation
  • Welding consumables carry their manufacturer’s certification and match the WPS
  • Material identification is in place: type and grade
  • The welder is qualified for the process and position
  • Groove welds: joint preparation, root opening, root face and bevel within tolerance
  • Groove welds: joint faces clean, tack welds sound, backing type and fit correct
  • Fillet welds: parts brought into contact, with any gap within the code limit
  • Weld access holes: shape and finish as detailed

Three signatures

Who signs the fitting station

Every member carries a process control tag. At fit-up, three people sign it before welding can start, each with a date.

Fitter

Lays out center lines and working points from the drawing, fits the parts, tacks them and checks the main dimensions and joint preparation.

signaturedate

Foreman

Rechecks the main dimensions and the joint preparation before letting welding begin, and signs the process control tag.

signaturedate

QC inspector

Checks the full dimensions, hole positions and diameters and the joint preparation against the drawing, signs the tag and records the Dimension Inspection Report.

signaturedate

Tack welds

Small welds, held to the same care

  • Tack welds hold parts firmly in place and are made by qualified welders under the same procedure care as the final weld.
  • No tack welds at the ends of a weld line or at corners, where they would interfere with the start and stop of the final weld.
  • Slag is removed from every tack, and arc strikes on the parent metal are avoided.
  • Where stitch welds are specified, the seam is marked before fitting so the tacks fall inside the final welds.
  • For fillet welds, AWS D1.1 limits the gap between parts, and the leg size is increased by the gap when it exceeds 2 mm (1/16 in).
Fitter comparing a built-up beam with its shop drawing
Stiffened heavy plate girders resting on shop supports
Crew assembling a large steel truss on the shop floor

QC and QA

Who checks what at this checkpoint

US practice separates the fabricator’s quality control from the quality assurance carried out for the owner. World Steel runs the QC; your side decides how much QA it adds, and the Engineer of Record sets what is acceptable.

World Steel QC

Quality control: the fabricator

Checks every fitted assembly against the drawing and WPS before final welding, signs the process control tag and records the dimensions.

Your inspector

Quality assurance: owner, special or third-party inspector

Can set the first fit-up of each member type as a hold point in the ITP and inspect it in Vietnam or by live video.

Your Engineer of Record

Sets the criteria, rules on what changes the design

Approves the joint details on the drawings and any change of joint geometry the shop proposes.

Inspectors can attend in Vietnam, join hold points live on Zoom or Microsoft Teams, or be given remote access to the records on request. The plant itself is audited twice a year under IAS AC472, with periodic plant inspections by Smith-Emery Laboratories.

Questions from US contractors and inspectors

Questions about fit-up inspection

Ask us anything else about this checkpoint before you award, or during the job through your project manager.

Why inspect fit-up separately from the finished weld?

Because a finished weld hides its root. Once the joint is welded out, a wrong root opening or bevel can only be found by testing, and it can only be fixed by cutting the weld out. At fit-up it takes minutes to correct.

What root opening do you allow on full-penetration welds?

No more than 3 mm (1/8 in) on complete-joint-penetration fit-ups, or the opening the welding procedure states for that joint. Anything outside is corrected and re-inspected before welding.

Who signs off fit-up?

The fitter, the foreman and a QC inspector each sign the process control tag at the fitting station. A member with a missing signature cannot move to welding.

Can our inspector check the first assembly of each type?

Yes. Mark the first fit-up of each member type as a hold point in the ITP, and production waits for your inspector, in person or live by video, before welding out.

What happens when a fit-up is out of tolerance?

It is corrected straight away by the fitting team and called back for re-inspection. It does not proceed to welding until QC accepts it.

Do you check weld access holes?

Yes. Their shape and finish are checked against the detail before welding, as AISC 360 lists among the tasks to perform prior to welding.