Design step: permit submittal package

The steel part of your permit set, in the order plan reviewers read it

Calculations, design drawings, product data and fabricator documents are assembled in the order US plan reviewers expect. Your Engineer of Record reviews, approves and seals them, and the US contractor, our customer, submits one complete set to the building department.

Tab by tab

What goes into the steel section of a permit set

This is the order we assemble the steel part of the package in. Plan reviewers find the design criteria before the calculations, and the calculations before the sheets that rely on them.

Transmittal and project data

Project address, occupancy and construction type, building area and height, code edition, and the list of documents in the package with their revisions.

US contractor, with our data

Design criteria summary

The frozen design basis on one page: risk category, wind, snow, seismic, collateral and live loads, deflection limits and material grades.

World Steel, confirmed by your EOR

Structural calculations

The Design Report with an index up front: load derivation, frame and bracing analysis, member checks, purlin and girt checks, connections, base plates and reactions.

World Steel, reviewed and sealed by your EOR

Design drawings

The approved set: general notes, anchor rod plan and reactions, framing plans, sections, elevations, bracing and typical details, all on one revision.

World Steel, reviewed and sealed by your EOR

Product data

Data sheets for roof and wall panels, fasteners, insulation and accessories in our supply, and evaluation reports where the product maker holds them and the reviewer asks for them.

World Steel and product makers

Fabricator and inspection documents

World Steel’s IAS AC472 accreditation certificate, the quality manual summary and the material certificate format, for the special inspection discussion with the building official.

World Steel

Deferred submittal list

Where the metal building is a deferred submittal, the items deferred and how they will be reviewed by your Engineer of Record before they reach the building department.

Your EOR, with our input

Deferred submittals

When the steel follows the main permit

On many US projects, the metal building or the structural steel is handled as a deferred submittal under IBC Section 107.3.4.1. The building official agrees that part of the design can be submitted after the main permit, and the Engineer of Record lists those items on the permit drawings.

Deferral moves the deadline, not the review. The deferred documents still go to your Engineer of Record first, who checks that they fit the building design, then on to the building department. We prepare them so they can move through both reviews without a second round of questions.

Shop inspection

A fabricator abroad and US special inspection

IBC Chapter 17 requires special inspection of structural steel, and Section 1704.2.5 lets the building official rely on an approved fabricator program instead of sending inspectors into the shop. World Steel is accredited under IAS AC472, and its certificate and quality documents travel in the package.

Whether your jurisdiction accepts that program is the building official’s decision, not ours. The package gives your team what it needs to ask early, and witness inspections at our plant can be arranged in person or online if the answer is no.

IAS AC472 accreditation

Plan check

When the reviewer writes back

Plan check comments come to the US contractor. The ones about the steel come to us, and we turn them around as a package your Engineer of Record can adopt.

A written answer to each comment

For every structural comment on the steel, our engineer drafts a response your Engineer of Record can adopt, edit or reject.

Revised sheets and calculations

Where a comment changes the design, the calculations and sheets are revised, clouded and reissued for your engineer to review and seal again.

One revision across the set

Calculations, drawings and the comment response all carry the same revision, so the reviewer never compares mismatched documents.

Jurisdictions that ask for more

Where the package grows

The core of the package is the same everywhere. These are the places where the code, the review path or the product rules add to it.

California

The California Building Code adds its own amendments, and state agencies review schools and hospitals separately from city building departments. Seismic detailing and AWS D1.8 welding records carry more weight.

California steel solutions

Florida

The Florida Building Code applies statewide, and envelope products in the High-Velocity Hurricane Zone face product approval rules. We do not claim Florida product approvals or Miami-Dade NOAs.

Florida steel solutions

Large cities with their own code

Some cities write or heavily amend their own building code. The edition and amendments are confirmed on the design basis before calculations are run.

Mountain and snow country

Counties may publish their own ground snow loads and drift rules. The local value goes on the sheet with its source.

Before it goes in

Eight checks on the steel section

A rejected submittal costs far more time than the few minutes these checks take. These are the checks we run on our part of the package before it leaves for your Engineer of Record.

  • Every sheet and the calculations carry the same revision
  • Code edition matches what the jurisdiction enforces on the filing date
  • Column reactions agree with the foundation drawings in the same set
  • Design loads on the drawings match the architectural and MEP sheets
  • Deferred items are listed on the main permit drawings
  • Special inspection and fabricator approach agreed with the building official
  • Product data included for every envelope product in our supply
  • Engineer of Record has reviewed and sealed what the jurisdiction requires

Who owns this step

Clear lines between our scope and yours

World Steel designs and fabricates the steel structure. Approval, the PE seal, the permit and the erection stay with the US contractor and the Engineer of Record they appoint.

World Steel

Designs, details and fabricates the steel in Vietnam

Prepares the steel calculations, drawings, product data and fabricator documents, assembles them in reviewer order, and drafts answers to plan check comments on the steel.

Your Engineer of Record

Reviews, approves and seals for your permit

Reviews the calculations and drawings, approves them, applies the PE seal where the jurisdiction requires it, and owns the structural design for the permit.

The US contractor, our customer

Submits, builds the foundations and erects

Files the permit, pays the fees, coordinates the full set with the architect and other trades, and is the building department’s point of contact.

Questions from US contractors

Questions about the permit package

Does World Steel submit the permit?

No. The US contractor, our customer, files the permit and deals with the building department. We prepare the steel content of the package and support the answers to plan check comments.

Does World Steel seal the drawings?

No. World Steel designs and fabricates the steel structure. Your Engineer of Record reviews and approves our calculations and drawings and applies the PE seal where the jurisdiction requires one.

What is a deferred submittal?

Under the IBC, a building official can allow parts of the design, often the metal building, to be submitted after the main permit. The Engineer of Record lists the deferred items on the permit drawings and reviews the deferred documents before they go to the building department.

Will our building department accept a fabricator in Vietnam?

The building official decides. World Steel is accredited under IAS AC472, and the IBC lets officials rely on approved fabricator programs for shop inspection. We give your team the documents to ask the question early, before production starts.

Can you fill in our state or city forms?

We provide the steel data those forms ask for: loads, material grades, product information and fabricator details. The forms themselves are signed by your team.

What happens when plan check comes back with comments?

Send us the comments on the steel. Our engineer drafts a written response and revises calculations or sheets where needed, for your Engineer of Record to review and resubmit through you.