Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Dominican Republic · Resorts and hotels

Steel for Dominican resorts and hotels

The Dominican Republic is the Caribbean’s largest tourism market. Resorts line the east coast from Punta Cana and Bávaro to Cap Cana and Uvero Alto, with more at La Romana, Juan Dolio, Puerto Plata, Sosúa, Cabarete, Samaná and, newest, Pedernales in the south-west. A large resort is a town of buildings: hotel blocks, lobbies, theatres, restaurants, staff housing and stores. A steel frame made off site and shipped in erection order lets many buildings rise at once.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Caucedo.

Red multi-story process tower frame next to a feed mill
Process tower frame by World Steel in Vinh Long Province, Vietnam.
East coast
Punta Cana, Bávaro
South
La Romana, Juan Dolio
North
Puerto Plata, Samaná
Capacity
2,500 t a month

Project types

What we fabricate for Dominican resorts

Hotel blocks

Multi-storey frames with composite deck for rooms and suites.

Theatres and lobbies

Long-span roofs over lobbies, theatres and ballrooms.

Restaurants and retail

Open-plan frames for restaurants, shops and plazas.

Staff housing

Repeatable multi-storey frames.

Back of house

Stores, laundries, workshops and cold rooms.

Airport buildings

Terminal, hangar and cargo frames.

Speed

Many buildings, one opening date

We fabricate while your site builds the foundations, then ship building by building so each crew has its steel when it needs it. Composite deck replaces most formwork.

Large packages are released by building or by phase. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Who does what

Project work, split clearly

World Steel supplies

  • Steel design or detailing to the Dominican building regulations
  • Fabrication, coating and QC release
  • Composite deck, studs and secondary steel
  • Packing by building and shipping to the nearest port
  • Shop and erection drawings, included

The contractor arranges

  • Owner contract and permits
  • Engineer of record approval
  • Foundations and anchor bolts
  • Erection and concrete topping
  • Finishes, services and fit-out

Products and solutions

The World Steel pages behind this guide

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Dominican Republic project is cut, welded, inspected and packed.

Multi-story steel frame rising next to a fabrication hall
Going up beside the plant in Vietnam: World Steel framed its own office building.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Pair of red truss assemblies with bolted connection plates inside the shop
Two trusses finished in red primer at World Steel in Vietnam.
Metal floor deck laid on each level of a steel-framed building
Going up beside the plant in Vietnam: World Steel framed its own office building.

Q&A

What Dominican buyers ask

Can a steel frame help a resort open on time?

Yes. Members are made while foundations are built and many buildings can rise at once, much faster than cast concrete.

Can you supply a whole resort, building by building?

Yes. We release and pack each building as its own kit, in the order your site needs them.

Do you work with Dominican contractors?

Yes. Contractors in the Dominican Republic are our customers: they win the work and erect it, and we design, fabricate and supply the steel.

Contact World Steel · Dominican Republic

Talk to us about steel for the Dominican Republic

WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.