Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Samaná · Province

Steel buildings and structural steel for Samaná, Dominican Republic

The Samaná peninsula is known for humpback whales in the bay, the beaches of Las Terrenas and Las Galeras, resorts and the El Catey airport. The 1946 earthquake struck offshore.

The Cibao and the north · Provincial capital Santa Bárbara de Samaná

Site conditions in Samaná

What the site asks of your steel

Seismic
North-east offshore faults
Wind
Open coasts
Air
Salt spray
Rain
Heavy rain

Our design note. Samaná builds resorts, villas and marine buildings on an active, exposed peninsula. Seismic detailing, wind design and marine coatings shape the steel.

Samaná at a glance

The ground, the work and the road in

Ground and climate

Mountain spine and coastal plains, with soft soils at the bay.

What gets built

Tourism, fishing, coconuts and services.

Getting steel there

By highway from Caucedo, or from Puerto Plata along the north coast.

Towns: Samaná · Las Terrenas · Las Galeras · Sánchez · El Catey

Steel we recommend

What we fabricate for Samaná

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Hotels and resorts

Hotel blocks, resort buildings, restaurants and long-span lobbies.

Multi-story steel buildings →

Hangars and terminals

Long-span frames for hangars, cargo sheds and terminal buildings.

Aircraft hangar buildings →

Marinas and marine buildings

Marina buildings, boat sheds, cruise and ferry terminals.

Coastal corrosion protection →

Contractors in Samaná

You win the job in Samaná. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Samaná

Can you supply resort buildings in Las Terrenas?

Yes. Hotel frames and villa kits with marine coatings.

Is Samaná a high seismic area?

Offshore faults are active. Your engineer sets the values under R-001.

The Cibao and the north

Other provinces: the cibao and the north

Santiago, Puerto Plata, La Vega, Samaná and the valley provinces: industry, farming, free zones and the north coast resorts.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Dominican Republic. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Dominican Republic

Talk to us about steel for Samaná

Send the drawings or the site, size and use. We design or detail the steel for Samaná’s earthquake, hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Puerto Plata or Caucedo. WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.