Dominican Republic · Regulations

Structural steel and Dominican building regulations

A new building in the Dominican Republic needs a construction licence from the Ministry of Housing and Buildings (MIVED), a municipal permit from the ayuntamiento and, for larger projects, environmental authorization. The national regulations include R-001 for seismic design, and engineers widely use US references such as AISC for steel. Your engineer of record sets the basis; we state it on the first sheet of our calculations, in English, with Spanish summaries on request.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Caucedo.

Mobile crane lifting a member into a multi-story steel frame
Going up beside the plant in Vietnam: World Steel framed its own office building.
Licence
MIVED
Seismic
R-001 regulation
Design basis
Set by your engineer of record
Our part
Basis stated on sheet one

Why it matters

National regulations, US steel practice

The Dominican regulations set the seismic and load framework, and steel design commonly follows AISC 360 and AISC 341. That makes our US-practice design and detailing a natural fit, as long as the basis is stated clearly.

Hotel chains, free-zone tenants and their lenders often add their own specifications. We design to the basis your engineer of record agrees with the owner and the authorities, and keep it on every sheet.

Design basis

What the steel design states

The items we confirm with your engineer of record in the Dominican Republic before modeling.

ItemWhat we state
RegulationsThe Dominican regulations and references agreed for the project
SeismicZone, soil type and spectral values under R-001
WindBasic wind speed, exposure and importance
SteelAISC 360 design, AISC 341 where seismic detailing applies
WeldingAWS D1.1, with AWS D1.8 for demand-critical welds

Who does what

Permit work, split clearly

World Steel supplies

  • Steel design or detailing to the Dominican building regulations
  • Calculations and drawings for review
  • Answers to plan-review comments on the steel in the Dominican Republic
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

In Dominican Republic, the contractor and the engineer of record arrange

  • MIVED licence and municipal permit
  • Environmental authorization
  • Soil study and seismic site data
  • Inspections and supervision on site
  • Foundations and erection

Dominican Republic

What we do not claim

World Steel holds no approval, licence or registration in the Dominican Republic and does not apply for permits. The engineer of record approves the design and your team files it with the authorities in the Dominican Republic.

Products and solutions

The World Steel pages behind this guide

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Dominican Republic project is cut, welded, inspected and packed.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Plate and coil strip racked by grade and heat number in the store
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.

Q&A

What Dominican buyers ask

Who issues construction licences in the Dominican Republic?

The Ministry of Housing and Buildings (MIVED), with a municipal permit from the ayuntamiento. Your team files with the engineer or architect of record.

Does Dominican practice use US steel standards?

Commonly yes: AISC 360 and AISC 341 within the national regulations. Your engineer of record sets the basis.

Can you supply documents in Spanish?

Calculations and drawings are in English with metric units first; we can add Spanish summaries and notes on request.