Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Pedernales · Province

Steel buildings and structural steel for Pedernales, Dominican Republic

Pedernales is the far south-west on the Haitian border, with Bahía de las Águilas, Jaragua National Park and the new Cabo Rojo tourism development.

The south and west · Provincial capital Pedernales

Site conditions in Pedernales

What the site asks of your steel

Wind
Hurricanes from the south
Seismic
Enriquillo fault zone
Air
Dry salt air
Ground
Limestone

Our design note. Pedernales is building new hotels, tourism infrastructure and public buildings. Fast frames shipped by building, wind and seismic design and marine coatings shape the steel.

Pedernales at a glance

The ground, the work and the road in

Ground and climate

Dry limestone coast and plains.

What gets built

New tourism, fishing, border trade and public services.

Getting steel there

By highway from Barahona or Haina.

Towns: Pedernales · Oviedo · Cabo Rojo · Bahía de las Águilas

Steel we recommend

What we fabricate for Pedernales

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Hotels and resorts

Hotel blocks, resort buildings, restaurants and long-span lobbies.

Multi-story steel buildings →

Schools, halls and sports

Classrooms, community halls, sports buildings and shelters.

Sports facilities and arenas →

Warehouses and logistics

Clear-span warehouses and distribution centres near the ports and highways.

Warehouse and distribution buildings →

Contractors in Pedernales

You win the job in Pedernales. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Pedernales

Can you supply hotel buildings for Cabo Rojo?

Yes. Hotel frames and long-span lobbies with marine coatings.

Can steel reach Pedernales?

Yes, by highway along the south coast; we plan bundle sizes for the route.

The south and west

Other provinces: the south and west

San Cristóbal with the port of Haina, Peravia, Azua, Barahona, San Juan and the border provinces.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Dominican Republic. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Dominican Republic

Talk to us about steel for Pedernales

Send the drawings or the site, size and use. We design or detail the steel for Pedernales’s earthquake, hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Río Haina. WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.