Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Hermanas Mirabal · Province

Steel buildings and structural steel for Hermanas Mirabal, Dominican Republic

Hermanas Mirabal, named for the Mirabal sisters, is a small farming province around Salcedo in the eastern Cibao.

The Cibao and the north · Provincial capital Salcedo

Site conditions in Hermanas Mirabal

What the site asks of your steel

Seismic
Septentrional fault
Ground
Valley soils
Rain
Heavy rain
Wind
Hurricanes inland

Our design note. Hermanas Mirabal needs farm buildings, schools and shops. Seismic detailing and simple, repeatable frames fit the province.

Hermanas Mirabal at a glance

The ground, the work and the road in

The province carries the name of the Mirabal sisters, killed in 1960 for opposing the Trujillo dictatorship; their house museum stands at Ojo de Agua near Salcedo. 25 November, the day they died, is now the International Day for the Elimination of Violence against Women.

Ground and climate

Valley and hill soils.

What gets built

Farming, agro-industry and commerce.

Getting steel there

From Puerto Plata over the mountains to Santiago, or from Caucedo north on the Autopista Duarte, then east across the Cibao to Salcedo.

Towns: Salcedo · Tenares · Villa Tapia

Steel we recommend

What we fabricate for Hermanas Mirabal

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Farm and agro-industry

Packhouses, rice mills, cacao and tobacco stores, livestock sheds.

Agricultural steel buildings →

Schools, halls and sports

Classrooms, community halls, sports buildings and shelters.

Sports facilities and arenas →

Commercial buildings

Shopping centres, showrooms, offices and mixed-use blocks.

Commercial steel buildings →

Contractors in Hermanas Mirabal

You win the job in Hermanas Mirabal. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Hermanas Mirabal

Can you supply school buildings?

Yes. Classrooms and halls detailed for the seismic values your engineer sets.

Can you supply farm stores?

Yes. Clear-span stores and packhouses.

How does steel reach Hermanas Mirabal?

Steel for Salcedo usually lands at Puerto Plata or Caucedo and travels by highway across the Cibao. Farm stores and schools ship as complete kits.

The Cibao and the north

Other provinces: the cibao and the north

Santiago, Puerto Plata, La Vega, Samaná and the valley provinces: industry, farming, free zones and the north coast resorts.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Dominican Republic. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Dominican Republic

Talk to us about steel for Hermanas Mirabal

Send the drawings or the site, size and use. We design or detail the steel for Hermanas Mirabal’s earthquake, hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Puerto Plata or Caucedo. WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.