Grades
Hollow section and pipe grades for US drawings
Rounded cards are round tube and pipe, square cards are rectangular HSS. Every grade feeds a plant that fabricates 2,500 metric tons of structural steel a month.
-
Regular grade
ASTM A500 Grade C
Square and rectangular
345MPa yield (50 ksi)
Tensile 425 MPa (62 ksi)
The usual grade for rectangular HSS columns, braces and truss chords on US drawings.
-
Regular grade
ASTM A500 Grade C
Round
315MPa yield (46 ksi)
Tensile 425 MPa (62 ksi)
Round columns, canopy posts and braces.
-
Regular grade
ASTM A500 Grade B
Square and rectangular
315MPa yield (46 ksi)
Tensile 400 MPa (58 ksi)
Still named on some drawings; Grade C tube meeting both grades is common.
-
Regular grade
ASTM A1085 Grade A
Square, rectangular and round
345–485MPa yield (50–70 ksi)
Tensile 450 MPa (65 ksi)
Tighter wall and mass tolerances, a maximum yield and mandatory Charpy toughness: chosen for seismic braces and exposed structures.
-
Regular grade
ASTM A53 Grade B
Round pipe
240MPa yield (35 ksi)
Tensile 415 MPa (60 ksi)
Steel pipe for columns, bollards, handrails and pipe supports.
-
On request
ASTM A252 Grade 2 / 3
Pipe piles
240 / 310MPa yield (35 / 45 ksi)
Tensile 415 / 455 MPa (60 / 66 ksi)
Welded and seamless pipe for piles, where the piles are in our scope.
-
On request
ASTM A847
Weathering HSS
345MPa yield (50 ksi)
Tensile 485 MPa (70 ksi)
Cold-formed weathering tube for unpainted frames.
Minimum yield and tensile values from each ASTM specification. "On request" grades are sourced per project and confirmed, with their mill, in your proposal before you order.
A500 or A1085
Same 345 MPa (50 ksi) tube, two different promises
A1085 was written for designers who want tighter tolerances and toughness written into the tube. A500 Grade C remains the workhorse. We order the one your drawings name.
Engineering guides on these grades
The design wall thickness that AISC 360 lets your engineer use differs by specification and by edition; check the edition named for your project. We order the specification on your drawings.
Square, round, pipe
Four hollow shapes, ordered in the US sizes on your drawings
If a mill rolls a close metric size instead, it is offered only as a written substitution request for your Engineer of Record.
Square HSS
Columns, posts and truss chords. Sized by outside dimension and wall, for example HSS 203 x 203 x 9.5 mm (HSS 8x8x3/8).
Rectangular HSS
Beams, girts, braces and lintels where one axis carries more load.
Round HSS
Columns, braces and canopy posts with the same stiffness in every direction.
Steel pipe
Bollards, handrails, pipe columns and supports, ordered by nominal pipe size and schedule.
In our shop
What happens to a tube between intake and piece mark
Saw and profile cutting
Tube is sawn to length and profiled at the ends for brace and truss connections.
Cap and base plates
Plates welded to column ends and drilled for anchor rods or splices.
Slotted gussets
Braces slotted for knife plates, with the net-section reinforcement your engineer details.
Welded to qualified procedures
Flare-bevel, fillet and CJP welds made to AWS D1.1 procedures for tubular connections.
Galvanizing vent holes
Vent and drain holes placed before galvanizing so zinc reaches every inside face.
Heat traced
Every tube length keeps its heat number from intake to piece mark.
Where it goes
What we build from HSS and pipe
- Columns and postsSquare and round HSS columns for warehouses, canopies and multi-story frames.
- Braced framesA1085 or A500 braces for wind and seismic braced frames.
- TrussesTube trusses for long-span roofs and bridges.
- Pedestrian bridgesTube truss bridges, galvanized or painted.
- Canopies and solar carportsRound and square posts with cantilever beams.
- Pipe racksPipe supports, struts and walkway posts.
Questions from US contractors
HSS tube and steel pipe, answered
Which HSS grades can World Steel supply?
ASTM A500 Grades B and C, ASTM A1085 Grade A and ASTM A53 Grade B pipe. ASTM A252 pipe piles and A847 weathering tube are available on request, sourced per project.
Should my project use A500 or A1085?
That is your engineer’s call. A1085 adds a maximum yield, tighter wall tolerance and required Charpy toughness, so it is often chosen for seismic braces and exposed members; A500 Grade C covers most general framing. We order whichever your drawings name.
Is A53 pipe the same as round HSS?
No. A53 is a pipe specification with a lower minimum yield of 240 MPa (35 ksi) and pipe sizes by nominal size and schedule; round HSS to A500 or A1085 is a structural specification sized by outside diameter and wall. Your drawings decide which one is used.
Can you supply HSS in US imperial sizes?
Yes. We order the US size on your drawings. If a mill rolls a close metric size, it is offered only as a written substitution request for your Engineer of Record.
Can HSS be galvanized?
Yes. Vent and drain holes are placed in the shop drawings before galvanizing to ASTM A123 at the galvanizer your project specifies.
How are tubes traced to their certificates?
Each bundle is matched to its EN 10204 3.1 certificate at intake, every length keeps its heat number, and the finished piece mark lists it in PEB Studio.
Tube columns, braces or trusses to quote?
Send the drawings and the HSS schedule. We confirm every size and grade and quote the fabricated steel from a plant that turns out 2,500 metric tons a month.