Coil grades
Five ASTM coil products, each slit to the member it becomes
Coil is the raw material of the secondary frame and the building envelope. We roll-form it into purlins, girts and panels in the same plant that fabricates 2,500 metric tons of structural steel a month.
-
ASTM A653
Hot-dip galvanized (zinc)Regular grade- Grade
- SS Grade 50 / 55
- Yield
- 340 / 380 MPa (50 / 55 ksi)
- Coating
- Z180 – Z275 (G60 – G90)
- Becomes
- Z and C purlins, girts, eave struts and deck
-
ASTM A792
55% aluminum-zinc (Galvalume)Regular grade- Grade
- SS Grade 50 / 80
- Yield
- 340 / 550 MPa (50 / 80 ksi)
- Coating
- AZ150 – AZ165 (AZ50 – AZ55)
- Becomes
- Roof and wall panels, trims, flashings
-
ASTM A1011
Hot-rolled sheet and stripRegular grade- Grade
- SS Grade 50
- Yield
- 340 MPa (50 ksi)
- Coating
- Bare, then shop primed
- Becomes
- Heavier purlins and girts, painted after forming
-
ASTM A755
Prepainted coilRegular grade- Grade
- On A653 or A792 substrate
- Yield
- Per substrate
- Coating
- Paint system as specified
- Becomes
- Colored roof and wall panels, trims
-
ASTM A1008
Cold-rolled sheetOn request- Grade
- SS Grade 40 / 50
- Yield
- 275 / 340 MPa (40 / 50 ksi)
- Coating
- Bare
- Becomes
- Light formed parts that are painted or galvanized after forming
Minimum yield values from each ASTM specification for structural steel (SS) grades. "On request" grades are sourced per project and confirmed, with their mill, in your proposal before you order.
Coating weights
Zinc and aluminum-zinc coatings, metric name first
Coating mass is the total of both sides, as a triple-spot test minimum. The G and AZ names come from ASTM A653 and A792 in US units; the Z and AZ metric names are the same coatings in g/m².
- Z180(G60)
180 g/m² (0.60 oz/ft²)
Interior purlins and girts in dry buildings
- Z275(G90)
275 g/m² (0.90 oz/ft²)
The common choice for purlins, girts and exposed framing
- AZ150(AZ50)
150 g/m² (0.50 oz/ft²)
Galvalume roof and wall panels
- AZ165(AZ55)
165 g/m² (0.55 oz/ft²)
Galvalume roofing with the longest panel warranties
Thickness rules
Purlins are designed on the steel, not on the zinc
Base metal, not total thickness
Cold-formed members are designed on base metal thickness, the steel under the coating. A 1.5 mm (0.059 in) purlin is 1.5 mm of steel before zinc.
The 95% rule
AISI S100 accepts delivered steel whose uncoated thickness is at least 95% of the design thickness. We check it with a micrometer at intake, on every coil.
Gauge is a habit, not a spec
US drawings often say “16 gauge”. The order is written in millimetres and inches of base metal, so there is no doubt what was bought.
Read a coil tag
What every coil tag tells your reviewer before it is slit
Every coil that reaches our plant is checked against its tag and its EN 10204 3.1 certificate, then logged in PEB Studio. The purlins formed from it keep that coil number.
Engineering guides on these grades
Sample coil tag
- Specification
- ASTM A653/A653MThe standard the coil was made and tested to.
- Grade
- SS Grade 55 (380)Structural steel grade, minimum yield in ksi and MPa.
- Coating
- Z275 (G90)Zinc mass on both sides; the inspector checks it against the order.
- Thickness
- 1.90 mm BMTBase metal thickness, the number the purlin is designed on.
- Width
- 1,219 mm (48 in)Slit later to the strip width for each purlin size.
- Heat / coil number
- Logged at intakeLinks the coil to its 3.1 certificate and to every purlin formed from it.
What we roll
From coil to purlins, girts and panels
- Z purlinsLapped Z purlins for continuous roof spans.
- C purlinsC sections for purlins, eave struts and framed openings.
- Wall girtsGirts that carry wall panels and resist wind.
- Roof panelsStanding seam and through-fastened panels on A792 or prepainted coil.
- Wall claddingSingle-skin wall panels in the color your owner picks.
- Sheet steel weldingPurlin clips and light-gauge parts welded to AWS D1.3.
Questions from US contractors
Steel coil for metal buildings, answered
Which coil grades does World Steel use for purlins and girts?
Usually ASTM A653 Structural Steel Grade 50 or 55 galvanized coil, or ASTM A1011 Structural Steel Grade 50 hot-rolled coil primed after forming, whichever your drawings name. ASTM A1008 cold-rolled sheet is available on request.
What coating weight do you use?
The one in your specification. Z275 (G90) is the common choice for purlins and girts; panels on ASTM A792 Galvalume coil are usually AZ150 (AZ50) or AZ165 (AZ55).
Are your purlins measured by gauge?
No. We design and order by base metal thickness in millimetres with inches beside it, and check each coil at intake against the AISI S100 rule that delivered thickness must be at least 95% of design thickness.
Where does your coil come from?
Mainly from steelmakers and coaters in Vietnam, such as Hoa Phat Group, Formosa Ha Tinh, POSCO, Hoa Sen and Nam Kim. Naming them does not imply a partnership; the mill for each coil is the one on its certificate.
What if the coater certifies to JIS or AS instead of ASTM?
We compare the certified grade, coating mass and mechanical values with the ASTM order and send it to your Engineer of Record. It is used only with written acceptance.
Can I choose the panel color?
Yes. Prepainted coil to ASTM A755 is ordered in the color and paint system your owner selects, from the coater’s range.
A metal building envelope to quote?
Send the drawings and the panel specification. We confirm every coil grade, coating and color and quote the frame, purlins and panels from a plant that turns out 2,500 metric tons a month.