Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Reception and lobby of the World Steel head office in Ho Chi Minh City, with the World Steel sign and framed certificates

World Steel head office, 55 Le Thuc Hoach Street, Ho Chi Minh City: where visitors meet our engineers.

Materials · Grade cross reference

Steel grade cross reference: ASTM grades beside their closest JIS, EN, GB and KS grades

Pick an ASTM grade and see what comes closest in four other systems, with yield metric first and the gaps called out. Comparable is not interchangeable: your Engineer of Record decides, for steel fabricated in a plant that turns out 2,500 metric tons a month.

Cross reference

Pick an ASTM grade, see the closest grades in four other systems

The red line on each bar is the ASTM minimum yield. Blue means the comparable grade reaches it; amber means it falls short and would need your engineer to check the design.

Plate and shapes

Hollow sections

Sheet and coil

ASTM A36

250 MPa (36 ksi) minimum yield

Mild carbon steel. Most comparables match on strength; check carbon and toughness if the member is welded heavily.

  • JIS · Japan

    SS400

    JIS G 3101

    245 MPa (36 ksi)

    Lower yield
  • EN · Europe

    S275JR

    EN 10025-2

    275 MPa (40 ksi)

    Comparable strength
  • GB/T · China

    Q235B

    GB/T 700

    235 MPa (34 ksi)

    Lower yield
  • KS · Korea

    SS275

    KS D 3503

    275 MPa (40 ksi)

    Comparable strength

ASTM A572 Grade 50

345 MPa (50 ksi) minimum yield

High-strength low-alloy plate. JIS and KS 490 grades sit slightly lower on yield in their thinnest range.

  • JIS · Japan

    SM490B

    JIS G 3106

    325 MPa (47 ksi)

    Lower yield
  • EN · Europe

    S355J2

    EN 10025-2

    355 MPa (51 ksi)

    Comparable strength
  • GB/T · China

    Q355B

    GB/T 1591

    355 MPa (51 ksi)

    Comparable strength
  • KS · Korea

    SM355B

    KS D 3515

    355 MPa (51 ksi)

    Comparable strength

ASTM A992

345 MPa (50 ksi) minimum yield

W shapes with a maximum yield, a yield-to-tensile ratio of 0.85 or less and a carbon equivalent cap. Only building-structure grades with the same caps come close.

  • JIS · Japan

    SN490B

    JIS G 3136

    325 MPa (47 ksi)

    Lower yield
  • EN · Europe

    S355J2

    EN 10025-2

    355 MPa (51 ksi)

    Comparable strength
  • GB/T · China

    Q345GJB

    GB/T 19879

    345 MPa (50 ksi)

    Comparable strength
  • KS · Korea

    SN355B

    KS D 3861

    355 MPa (51 ksi)

    Comparable strength

ASTM A588

345 MPa (50 ksi) minimum yield

Weathering steel. Comparables are also weathering grades, but the alloy recipe and the atmospheric corrosion index differ.

  • JIS · Japan

    SMA490AW

    JIS G 3114

    365 MPa (53 ksi)

    Comparable strength
  • EN · Europe

    S355J2W

    EN 10025-5

    355 MPa (51 ksi)

    Comparable strength
  • GB/T · China

    Q355NH

    GB/T 4171

    355 MPa (51 ksi)

    Comparable strength
  • KSNo comparable we list with confidence. Ask us for the specific mill grade.

ASTM A514

690 MPa (100 ksi) minimum yield

Quenched and tempered plate. Toughness class and welding rules must be checked line by line.

  • JIS · Japan

    SHY685

    JIS G 3128

    685 MPa (99 ksi)

    Lower yield
  • EN · Europe

    S690QL

    EN 10025-6

    690 MPa (100 ksi)

    Comparable strength
  • GB/T · China

    Q690D

    GB/T 16270

    690 MPa (100 ksi)

    Comparable strength
  • KSNo comparable we list with confidence. Ask us for the specific mill grade.

ASTM A500 Grade C

345 MPa (50 ksi) minimum yield

Cold-formed rectangular HSS. the JIS tube grade is lower on yield; EN 10219 S355J2H is the usual comparison.

  • JIS · Japan

    STKR490

    JIS G 3466

    325 MPa (47 ksi)

    Lower yield
  • EN · Europe

    S355J2H

    EN 10219-1

    355 MPa (51 ksi)

    Comparable strength
  • GB/T · China

    Q355B

    GB/T 6728

    355 MPa (51 ksi)

    Comparable strength
  • KSNo comparable we list with confidence. Ask us for the specific mill grade.

ASTM A53 Grade B

240 MPa (35 ksi) minimum yield

Steel pipe. Comparable pipe grades exist, but sizes follow different schedule systems.

  • JIS · Japan

    STK400

    JIS G 3444

    235 MPa (34 ksi)

    Lower yield
  • EN · Europe

    S235JRH

    EN 10219-1

    235 MPa (34 ksi)

    Lower yield
  • GB/T · China

    Q235B

    GB/T 3091

    235 MPa (34 ksi)

    Lower yield
  • KSNo comparable we list with confidence. Ask us for the specific mill grade.

ASTM A653 SS Grade 50

340 MPa (50 ksi) minimum yield

Galvanized structural coil. Check coating mass too: Z275 equals G90.

  • JIS · Japan

    SGC490

    JIS G 3302

    365 MPa (53 ksi)

    Comparable strength
  • EN · Europe

    S350GD+Z

    EN 10346

    350 MPa (51 ksi)

    Comparable strength
  • GB/T · China

    S350GD+Z

    GB/T 2518

    350 MPa (51 ksi)

    Comparable strength
  • KS · Korea

    SGC490

    KS D 3506

    365 MPa (53 ksi)

    Comparable strength

ASTM A792 SS Grade 80

550 MPa (80 ksi) minimum yield

High-strength Galvalume panel steel. Elongation is low in every system; check it for formed profiles.

  • JIS · Japan

    SGLC570

    JIS G 3321

    560 MPa (81 ksi)

    Comparable strength
  • EN · Europe

    S550GD+AZ

    EN 10346

    550 MPa (80 ksi)

    Comparable strength
  • GB/T · China

    S550GD+AZ

    GB/T 14978

    550 MPa (80 ksi)

    Comparable strength
  • KSNo comparable we list with confidence. Ask us for the specific mill grade.

ASTM A1011 SS Grade 50

340 MPa (50 ksi) minimum yield

Hot-rolled structural strip for purlins. Thermomechanical cold-forming grades are the closest match.

  • JIS · Japan

    SS490

    JIS G 3101

    285 MPa (41 ksi)

    Lower yield
  • EN · Europe

    S355MC

    EN 10149-2

    355 MPa (51 ksi)

    Comparable strength
  • GB/T · China

    Q355B

    GB/T 1591

    355 MPa (51 ksi)

    Comparable strength
  • KS · Korea

    SS315

    KS D 3503

    315 MPa (46 ksi)

    Lower yield

Minimum yield for the thinnest thickness range of each standard; most fall as thickness rises. Names and values change between editions, so the certificate and the edition named on it are what count. This chart is a starting point for your engineer, not an approval.

The whole chart

ASTM steel grades and their closest comparables, side by side

Comparable grades share a strength level; they are not interchangeable. Values in amber fall below the ASTM minimum yield.

ASTM steel grades compared with JIS, EN, GB/T and KS grades, minimum yield in MPa
ASTM gradeJISENGB/TKS
ASTM A36250 MPa (36 ksi) SS400JIS G 3101 · 245 MPa S275JREN 10025-2 · 275 MPa Q235BGB/T 700 · 235 MPa SS275KS D 3503 · 275 MPa
ASTM A572 Grade 50345 MPa (50 ksi) SM490BJIS G 3106 · 325 MPa S355J2EN 10025-2 · 355 MPa Q355BGB/T 1591 · 355 MPa SM355BKS D 3515 · 355 MPa
ASTM A992345 MPa (50 ksi) SN490BJIS G 3136 · 325 MPa S355J2EN 10025-2 · 355 MPa Q345GJBGB/T 19879 · 345 MPa SN355BKS D 3861 · 355 MPa
ASTM A588345 MPa (50 ksi) SMA490AWJIS G 3114 · 365 MPa S355J2WEN 10025-5 · 355 MPa Q355NHGB/T 4171 · 355 MPa Ask us
ASTM A514690 MPa (100 ksi) SHY685JIS G 3128 · 685 MPa S690QLEN 10025-6 · 690 MPa Q690DGB/T 16270 · 690 MPa Ask us
ASTM A500 Grade C345 MPa (50 ksi) STKR490JIS G 3466 · 325 MPa S355J2HEN 10219-1 · 355 MPa Q355BGB/T 6728 · 355 MPa Ask us
ASTM A53 Grade B240 MPa (35 ksi) STK400JIS G 3444 · 235 MPa S235JRHEN 10219-1 · 235 MPa Q235BGB/T 3091 · 235 MPa Ask us
ASTM A653 SS Grade 50340 MPa (50 ksi) SGC490JIS G 3302 · 365 MPa S350GD+ZEN 10346 · 350 MPa S350GD+ZGB/T 2518 · 350 MPa SGC490KS D 3506 · 365 MPa
ASTM A792 SS Grade 80550 MPa (80 ksi) SGLC570JIS G 3321 · 560 MPa S550GD+AZEN 10346 · 550 MPa S550GD+AZGB/T 14978 · 550 MPa Ask us
ASTM A1011 SS Grade 50340 MPa (50 ksi) SS490JIS G 3101 · 285 MPa S355MCEN 10149-2 · 355 MPa Q355BGB/T 1591 · 355 MPa SS315KS D 3503 · 315 MPa

What differs

Six things that can differ when the yield matches

This is why a comparable grade goes to your Engineer of Record and is never swapped in on a buyer’s say-so.

  • Maximum yield and ratio

    A992 caps yield at 450 MPa (65 ksi) and the yield-to-tensile ratio at 0.85. Most general grades have no upper limit, which matters for seismic design.

  • Toughness temperature

    JR, J0 and J2 in EN names mean Charpy at 20 °C, 0 °C and −20 °C. A36 and A572 carry no Charpy test unless it is ordered.

  • Chemistry and weldability

    Carbon equivalent and alloy limits differ, and so do preheat needs. Our welding procedures are qualified on the actual base metal.

  • Section sizes and tolerances

    A metric H or tube close to a US size has different properties and tolerances. A size change is a design change, not just a grade change.

  • Thickness steps

    Each standard lowers its minimum yield at different thickness steps. Compare at the plate thickness you are actually using.

  • Test frequency

    Some standards test per heat, some per lot or per plate. The certificate must show what your specification asks for.

Mill certificates

Where the certificates come from, and what we do with them

Our steel comes mainly from mills in Vietnam, with Japan, Korea, Indonesia and Thailand when a specification calls for it. It feeds a plant that fabricates 2,500 metric tons of structural steel a month, so every certificate is checked at our gate.

  • Dual-certified where possible

    Many plate, section and coil products from mills in Vietnam are produced and certified to ASTM, or to ASTM and JIS together. Where that is the case, no comparison is needed.

  • TCVN certificates

    Vietnamese national standards often follow JIS or ISO. A material certified only to TCVN is compared with the ASTM limits in exactly the same way as any other foreign grade.

  • Japan, Korea, Indonesia, Thailand

    When your specification calls for a grade or size not rolled in Vietnam, we source it from those mills, again ordered to the ASTM grade first.

Mills we source from in Vietnam

  • Hoa Phat Group
  • Formosa Ha Tinh
  • POSCO
  • Hoa Sen
  • Nam Kim

Naming them does not imply a partnership or endorsement; the mill for each heat is the one on its certificate.

Substitution

How a comparable grade gets used, or does not

  • We find the gap

    If the ASTM grade or US size is not available on your schedule, we tell you before ordering, not after.

  • Side-by-side comparison

    Certified chemistry, yield, tensile, elongation, toughness and section properties next to the ASTM limits and your design values.

  • Formal request to your EOR

    Sent through the US contractor, our customer, as a substitution request with the mill certificate attached.

  • Written acceptance or no

    Your Engineer of Record accepts, accepts with conditions such as added testing, or rejects. We order only after the answer.

  • Verification testing if asked

    Check tests at an ILAC-accredited laboratory or the laboratory you name, reported with the heat number.

  • Recorded with the member

    The accepted request stays in the Manufacturing Data Record and on every piece mark made from that material.

Questions from US contractors

Steel grade cross reference, answered

Is JIS SS400 the same as ASTM A36?

No, it is comparable. SS400 has a lower minimum yield in its thinnest range (245 MPa against 250 MPa) and no carbon limit in some editions. It can be used in place of A36 only if your Engineer of Record accepts it in writing.

Is Q355B equal to A572 Grade 50?

They are close on minimum yield, 355 MPa against 345 MPa, but chemistry, test frequency and thickness steps differ. Treat it as comparable, not equal, and submit the certificate for acceptance.

Which grade is closest to A992?

Building-structure grades with a yield cap and yield-ratio limit, such as JIS SN490B, KS SN355B and GB/T 19879 Q345GJB, come closest. General grades like S355J2 match on strength but not on the upper limits that A992 adds.

Who decides whether a comparable grade can be used?

Your Engineer of Record. World Steel prepares the comparison; the US contractor, our customer, submits it; the EOR accepts or rejects it in writing.

Does World Steel substitute grades without asking?

Never. Material is ordered to the ASTM grade on your drawings. A comparable grade is only used after written acceptance, and the acceptance stays in the project record.

Why are some comparables marked as lower?

Because their minimum yield is below the ASTM grade’s. They are not drop-in replacements; your engineer would have to check the design at the lower value.

Do you supply TCVN-certified steel?

Most structural steel we buy in Vietnam is certified to ASTM, JIS, EN or KS. If a product is certified only to TCVN, we compare it with the ASTM limits and submit it like any other foreign grade.

A mill certificate you need compared?

Send the certificate and your material schedule. Our engineers set it against the ASTM limits for your Engineer of Record, for steel fabricated in a plant that turns out 2,500 metric tons a month.