Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Welder beside a deep built-up girder running through the automatic line

A deep plate girder going through automatic welding at World Steel, Vietnam.

Materials · Structural shapes

Wide flange beams, channels and angles in the US sizes your frame is drawn in

A992 W shapes, A36 and A572 channels and angles, ordered by their US designation from mills in Vietnam and abroad, then cut, drilled and welded into members in a plant that fabricates 2,500 metric tons a month.

Shape families

The rolled shapes in a US steel frame, drawn in section

Each card shows the family as it appears on your drawings, the grade it is usually ordered in and what it does in the frame. Every family runs through the beam lines of a plant that fabricates 2,500 metric tons a month.

  • ASTM A992

    Wide-flange beams and columns

    Beams, columns, rafters and girders: the backbone of US structural steel framing.

  • ASTM A36 · A572 Grade 50

    Channels

    Girts, struts, stair stringers, lintels and frame edges.

  • ASTM A36 · A572 Grade 50

    Angles

    Bracing, clip and seat connections, lintels and light trusses.

  • ASTM A992

    Structural tees

    Cut from W shapes in our shop for truss chords and hanger connections.

  • ASTM A36 · A572 Grade 50

    American standard beams

    Monorail and hoist beams with tapered flanges.

    On request
  • ASTM A572 Grade 50

    Bearing piles

    H-piles for foundations, where the pile is in our scope.

    On request

Grades

Shape grades, with the limits that set them apart

Minimum yield and tensile metric first, US units beside. A992 is the grade most US drawings name for W shapes.

SpecificationYieldTensileWhat makes it differentSupply
ASTM A992 345–450 MPa (50–65 ksi) 450 MPa (65 ksi) The US default for W shapes: a maximum yield of 450 MPa (65 ksi), a yield-to-tensile ratio of 0.85 or less and a carbon equivalent cap, so seismic and plastic design behave as predicted. Regular grade
ASTM A572 Grade 50 345 MPa (50 ksi) 450 MPa (65 ksi) Channels, angles, S and HP shapes. Same minimum yield as A992, without its maximum-yield and ratio limits. Regular grade
ASTM A36 250 MPa (36 ksi) 400–550 MPa (58–80 ksi) Angles and channels for secondary framing, bracing and connections. Regular grade
ASTM A588 Grade A 345 MPa (50 ksi) 485 MPa (70 ksi) Weathering shapes for exposed, unpainted frames and bridges. On request
ASTM A913 Grade 50 / 65 / 70 345 / 450 / 485 MPa (50 / 65 / 70 ksi) 450 / 550 / 620 MPa (65 / 80 / 90 ksi) Quenched and self-tempered heavy shapes with low carbon equivalent and good toughness, for jumbo columns and transfer girders. On request

Minimum values from each ASTM specification. "On request" grades are sourced per project and confirmed, with their mill, in your proposal before you order.

US sizes

One section, two names: US and metric W designations

A US W shape is named by nominal depth in inches and weight in pounds per foot; the metric name gives depth in millimetres and mass in kilograms per metre. Same section, two names. The section on your drawings is the one we order.

  • W200x46.1Metric: mm x kg/mW8x31US: in x lb/ftLight columns, platform posts
  • W310x38.7Metric: mm x kg/mW12x26US: in x lb/ftFloor beams, purlin-supporting beams
  • W360x134Metric: mm x kg/mW14x90US: in x lb/ftBuilding columns
  • W460x74Metric: mm x kg/mW18x50US: in x lb/ftFloor girders, crane brackets
  • W610x125Metric: mm x kg/mW24x84US: in x lb/ftLong-span beams and transfer girders
  • W920x223Metric: mm x kg/mW36x150US: in x lb/ftHeavy girders and frames

When a size is short

Three ways to get the section your frame needs

  • Rolled in Vietnam or imported

    Large W shapes come both from mills in Vietnam and from imports from Japan, Korea, Thailand and other mills that roll US sizes. We order the exact section on your drawings.

  • Built-up as a welded section

    If a size is hard to get on schedule, we can propose a welded plate section of A572 Grade 50 with at least the same properties, for your Engineer of Record to accept.

  • Metric H-section, only with approval

    A JIS or EN H-section close to the US size is offered only as a written substitution request, with its properties side by side, never swapped in silently.

Heavy shapes

Jumbo columns and thick flanges need more than a grade name

Heavy shapes for transfer girders, mill buildings and seismic frames carry toughness and tolerance rules of their own. We put them on the mill order, not on a hope.

  • Toughness for thick flanges

    AISC 360 Section A3.1c asks for Charpy V-notch testing of heavy shapes with flanges over 50 mm (2 in) thick when they are spliced with complete-joint-penetration welds in tension. We order it on the mill certificate, using the alternate core location.

  • Seismic systems

    AISC 341 sets toughness for thick members in the seismic force-resisting system and expects shapes such as A992 whose maximum yield is controlled. The material schedule shows it member by member.

  • Mill tolerances to ASTM A6

    Depth, flange tilt, camber and sweep are checked against ASTM A6 at intake, before the shape goes to the beam line.

  • Cut, coped and drilled

    Shapes are sawn, drilled and coped on CNC beam lines, with copes and access holes to the AISC 360 details.

Questions from US contractors

Wide flange beams and shapes, answered

Can World Steel supply US wide-flange sizes such as W14x90 or W24x84?

Yes. We order the W section shown on your drawings, to ASTM A992. Large W shapes come both from mills in Vietnam and from imports, and we confirm which in the proposal.

Do you substitute metric H-beams for US W shapes?

Not on our own. A metric section is offered only as a written substitution request with its properties next to the US section, and it is used only if your Engineer of Record accepts it. Otherwise we order the US size or propose a welded section.

What grade are channels and angles?

Usually ASTM A36 or A572 Grade 50, whichever your drawings name. A992 is a specification for W shapes; channels, angles and S shapes are not normally ordered to it.

Can you supply heavy shapes with Charpy V-notch results?

Yes, on request. For heavy shapes with thick flanges we order Charpy V-notch testing at the temperature your specification sets, as AISC 360 and AISC 341 require in the cases they cover.

Do you supply ASTM A913 shapes?

On request. A913 quenched and self-tempered shapes are sourced per project from mills that roll them; the proposal names the mill before you order.

How are the shapes traced?

Each shape is matched to its EN 10204 3.1 certificate at intake, stored by grade and heat, and every member made from it lists that heat number in PEB Studio and on its label.

Do you erect the steel?

No. World Steel designs, fabricates and supplies. The US contractor, our customer, erects the steel, and your Engineer of Record approves the drawings and materials.

A frame full of W shapes to quote?

Send the drawings. We confirm every section and grade, tell you which sizes come from Vietnam and which are imported, and quote the fabricated frame from a plant that turns out 2,500 metric tons a month.