Seismic steel jobs rarely go wrong at the welding machine. They go wrong in the paperwork: a drawing that never said which welds were Demand Critical, a QAP that arrived after the bid, a filler metal certificate nobody asked for until the inspector did. AWS D1.8 Clause 1.4 fixes this by setting out two lists. The first is what the Engineer must put in the contract documents. The second is what the Contractor, in practice the fabricator for shop work, must keep or submit. This article turns both into a working checklist for seismic weld submittals.
Who is "the Engineer" and who is "the Contractor"
D1.8 uses the D1.1 roles. The Engineer is the party responsible for the design, normally the Engineer of Record. The Contractor is the party doing the work, which covers the fabricator in the shop and the erector in the field. On an imported steel package, World Steel is the Contractor for shop welds, and the US contractor's erection team is the Contractor for field welds. The drawings, the design and the seal stay with the US engineer and the US general contractor.
Part one: what the drawings must say
Clause 1.4.1 lists fifteen items the Engineer adds to the D1.1 list. Here they are, grouped by what the shop does with them:
| Group | Item on the contract documents | What the shop uses it for |
|---|---|---|
| Scope | Connection configuration; connection materials and sizes; which members and connections are in the SFRS | Deciding which pieces follow D1.8 at all |
| Critical zones | Locations and dimensions of Protected Zones; locations of Demand Critical welds | Shop drawing marks, filler metal choice, welder assignment, test plan |
| Backing and tabs | Where backing is removed; where fillets reinforce groove welds; where fillets are added at left-in-place backing; where weld tabs are removed | Detailing the root treatment and finish of every flange joint |
| Geometry | Shape and location of weld access holes: standard, alternate or special | Cutting programs and inspection of cut surfaces |
| Service | Lowest Anticipated Service Temperature, if the structure is not enclosed and kept at 10 °C (50 °F) or warmer | Filler metal test temperature |
| Transitions | Butt joints in tension that need tapered transitions | Chamfering thicker or wider parts |
| Special care | Joints needing a set assembly order, welding sequence or technique | Shop sequence instructions |
| Quality | The project Quality Assurance Plan | Inspection and test plan, hold points, NDT scope |
| Other | Any project-specific provisions beyond D1.1 and D1.8 | Specification review |
The commentary adds context worth knowing at bid time:
- Backing and tab removal should be decided joint by joint. Removing every backing bar and every tab is costly and sometimes harmful, and in many locations test data supports leaving them. A frequently used pattern appears in Table C-1.1, covered in a later article in this series on backing removal.
- Special access hole shapes should only be specified where a connection needs them. Column splices, for example, do not.
- The QAP belongs in the bid documents. Special QA and QC requirements can change the cost of the work substantially, and AISC 341 Chapter J is recommended as the QAP without needless edits, so every bidder prices the same inspection.
Part two: what the shop keeps or submits
Clause 1.4.2 sets the fabricator's records. Unless the QAP asks for submittal, the rule is keep and show: documents are kept for at least one year after substantial completion and made available to the Engineer or Inspector on request. When the QAP requires a submittal, it goes to the Engineer and the fabricator keeps a copy.
| Clause | Record | Keep or submit |
|---|---|---|
| 1.4.2.1 | Certificates of Conformance for electrodes, fluxes and shielding gases, meeting the AWS A5 specification | Keep |
| 1.4.2.2 | Heat input envelope test certification (Annex A) for filler metals on Demand Critical welds with prequalified WPSs, from the manufacturer or from the fabricator's own tests | Keep |
| 1.4.2.3 | Manufacturer data sheets with recommended parameters and storage, exposure and baking guidance, for FCAW, SMAW and metal-cored GMAW | Supplied with the WPSs |
| 1.4.2.4 | Proof that filler metals meet the diffusible hydrogen limits | Keep |
| 1.4.2.5 | Annex E test results when FCAW exposure is extended beyond 72 hours | Keep |
| 1.4.2.6 | Welding procedure specifications | Fabricator responsible for all |
| 1.4.2.7 | PQRs for WPSs qualified by test | Submit to the Engineer |
| 1.4.2.8 | Annex D restricted access test records for welders on Demand Critical bottom flange welds | Keep |
The commentary notes that most of these records do not need lot-specific testing. A Certificate of Conformance normally covers the hydrogen requirement, and an Annex E report covers extended exposure for that product. That keeps cost down, as long as the fabricator collects the documents before welding starts, not after an inspector asks.
Records the code implies but does not list in 1.4.2
A few other records follow from the clauses that come later:
- Production lot data or the documented basis for an exemption (Clause 6.3).
- FCAW exposure logs that show accumulated hours per spool (Clause 6.4.3).
- Welder identification linking each joint to its welder (Clause 6.10).
- Repair records for Protected Zone gouges, mislocated holes and tab removal sites, with the MT result (Clauses 6.18, 6.19 and 7.8).
- Engineer approvals for erection aids in the Protected Zone and for repair procedures for mislocated holes, screws and pins (Clauses 6.18.2, 6.18.6 and 6.18.8).
- NDT reports, including UT procedure qualification on mockups and technician Annex F status where the QAP calls for it (Clause 7).
A pre-bid checklist for general contractors
Before you ask for a price on a seismic package, check that your bid set includes:
- Drawings that flag SFRS members and Demand Critical welds, not only a general note.
- Protected Zone dimensions for every yielding member.
- A backing, reinforcing fillet and weld tab schedule for each connection type.
- The weld access hole geometry, or a note that the D1.1 standard shape applies.
- LAST, or a statement that the structure is enclosed and kept at 10 °C or above.
- The QAP, with the split between QC and QA tasks and the NDT scope.
- The connection type for moment frames, such as an AISC 358 prequalified connection, since it carries its own fabrication limits.
When any of these is missing, a careful fabricator will either raise an RFI or price the conservative option. Either way, filling the gaps early protects your schedule.
A pre-award checklist for the fabricator's records
Before award, ask the fabricator to show:
- WPSs for each Demand Critical joint type, naming electrode manufacturer and trade name.
- PQRs, if any WPS is qualified by test.
- Certificates of Conformance and heat input envelope data for each filler metal.
- The production lot control or exemption approach.
- The FCAW storage and exposure procedure.
- Welder qualification records, including Annex D where needed.
- The inspection and test plan mapped to the QAP.
- Its quality accreditation, such as IAS AC472 or AISC certification, explained in our article on IAS AC472 and AISC certification.
Gaps that show up most often in seismic bid sets
In our experience reviewing seismic packages from US engineers, the same few gaps appear again and again:
- "All CJP welds in the SFRS are Demand Critical." A blanket note like this is safe for the designer but expensive for the job. It pulls continuity plate and doubler welds into the full Demand Critical regime when the connection prequalification does not require it.
- Protected Zones shown on one typical detail only. Every yielding member needs its zone located, including braces, links and reduced beam sections at different levels.
- No backing schedule. The connection detail shows backing, but not whether it stays, stays with a fillet, or comes off.
- LAST left blank on an open structure. Parking structures, canopies, pipe racks and unheated warehouses often see service temperatures below 10 °C. Without LAST, the shop cannot pick the filler metal test temperature.
- QAP referenced but not attached. The specification says "per the QAP," and the QAP arrives after award, with UT and MT scope nobody priced.
Each gap costs a few days if it is caught at bid time, and several weeks if it is caught after the steel is cut.
How records travel with an imported package
On a package fabricated overseas, the records matter even more, because the inspector who signs off the welds may not stand next to them. A good practice is to agree three things before fabrication starts: the format of the quality file (one PDF per shipment, indexed by piece mark), the hold points where the QA agency inspects in person or by video, and the point at which the records are handed over, normally with the shipping documents. The US contractor then has everything the building official or special inspector may ask for when the steel arrives, without waiting on email from another time zone. Our article on special inspection of fabricated steel explains how off-site fabrication is accepted under the IBC.
How World Steel handles seismic submittals
World Steel prepares shop drawings for every project at no extra cost and returns them for approval by the US engineer and the US contractor. On seismic jobs the first shop drawing submittal carries a D1.8 data sheet: the Demand Critical weld list, Protected Zone limits, backing and tab disposition, access hole geometry and LAST as we read them from the contract documents, with RFIs for anything unclear.
Records are kept in our IAS AC472 quality system, linked to each piece mark in PEB Studio, and handed over as a project quality file. The QA agency named in the QAP can review them, and the steel, through inspector access. Our article on the AWS D1.8 seismic welding code gives the bigger picture, and when your package is ready you can request a quote with the drawings and the QAP attached.
Quick answers
What must the Engineer show for AWS D1.8 work?
Clause 1.4.1 lists fifteen items, including SFRS members, Protected Zones, Demand Critical welds, backing and weld tab removal, access hole geometry, the Lowest Anticipated Service Temperature when needed, and the Quality Assurance Plan.
How long must the fabricator keep D1.8 records?
At least one year after substantial completion of construction, available to the Engineer or Inspector on request.
Which documents are submitted, not just kept?
PQRs for WPSs qualified by test are submitted to the Engineer under Clause 1.4.2.7. Other records are kept and shown on request unless the Quality Assurance Plan asks for them to be submitted.
Why should the QAP be in the bid documents?
The D1.8 commentary notes that special QA and QC requirements can change the cost of the work substantially, so bidders need them before pricing.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US general contractorsHow we support GCs, steel erectors and developers
- Lower cost, lower riskWhere overseas fabrication saves on large jobs
- Section 232 steel importsDuties and paperwork on imported steel
- Landed cost calculatorFreight, duty and fees to your US jobsite
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Solutions by stateState-by-state steel solutions