Filler metal production lot control for demand critical welds

Two spools of the same wire can weld differently if they come from different heats of raw material. AWS D1.8 Clause 6.3 controls that with lot classes, lot testing and a well-defined exemption. Here is how it works.

· 7 min read · World Steel USA engineering team

Filler metal is made in batches. Each batch draws on its own coil of steel strip or rod, its own blend of flux ingredients and its own run of production settings. Most of the time the results are uniform, but not always, and a seismic weld that depends on 54 J of toughness has little room for a weak batch. AWS D1.8 Clause 6.3 addresses this with filler metal production lot control for Demand Critical welds. This article explains what a lot is, when lots must be tested, and how the exemptions work, with a decision path a shop or a general contractor can use product by product.

Why lots matter

The D1.8 commentary is candid about the trade-off. Weld metal properties vary partly because raw materials and production practices vary. Testing every production lot gives high assurance that variation is under control, but it is expensive and has historically caused shortages of usable product. Modern filler metal plants run quality systems that keep production consistent. So D1.8 asks for lot testing by default, and allows a documented exemption once a product has shown it is consistent and the manufacturer's quality system is audited by a recognized body.

What counts as a production lot

Clause 6.3.1 uses the lot definitions in AWS A5.01, the procurement standard for filler metals, and requires the tighter classes:

Product Required lot class
SMAW electrodes C3 or C4
GMAW and SAW solid electrodes S3 or S4
GMAW and SAW composite (metal-cored) electrodes T3 or T4
FCAW electrodes T3 or T4
SAW fluxes F2

In plain terms, the higher classes tie a lot to a controlled set of raw materials and a defined production run, so a lot number really identifies a consistent product. When ordering filler metal for a seismic job, the purchase order should state the lot class, because standard commercial orders may not.

The default: test each lot

Clause 6.3.2 says each production lot of filler metal used for Demand Critical welds is tested to:

  1. the classification tests of its AWS A5 specification, and
  2. for prequalified WPSs, the Annex A heat input envelope tests.

That means a new lot of flux cored wire arriving at the shop would, by default, need its own classification test results and its own pair of high and low heat input test plates. For a large seismic package using several products over many months, that adds up quickly.

Exemption for prequalified WPSs

Clause 6.3.3.1 offers the main way out. Filler metal used with prequalified WPSs for Demand Critical welds is exempt from lot testing when three conditions are met:

  1. Three lots tested. At least three different lots, of the required class, for each trade name and diameter used in production, have been tested to Annex A.
  2. An audited manufacturer. The filler metal was made by a manufacturer audited and approved by at least one of: the American Bureau of Shipping (ABS), Lloyd's Register, the American Society of Mechanical Engineers (ASME), the US Department of Defense, or a quality assurance program acceptable to the Engineer.
  3. Periodic retesting. To keep the exemption, the manufacturer repeats the Annex A tests on at least one production lot of each trade name and diameter at least every three years.

The commentary adds that Certificates of Conformance or other data from three lots, as tested by the manufacturer, satisfy the first condition. The manufacturer keeps that data and provides it on request, and the fabricator should make sure it is available before relying on the exemption.

Exemption for WPSs qualified by test

WPSs qualified by test have their own path under Clause 6.3.3.2, because Annex A is not used for them:

  • The lot used in the qualification test may be used for production.
  • If at least three different lots were used in WPS qualification tests within a three-year period, lot testing is exempt as long as the WPS is requalified at least every three years.
  • Alternatively, if the filler metal has Annex A data and meets all the conditions of 6.3.3.1, it may be used with qualified WPSs without further lot testing.

The 2025 edition added this alternative, which helps shops that qualify WPSs by test but buy well-documented commercial products.

Exemption for proven electrodes

Some products deposit tough weld metal so reliably that D1.8 exempts them outright. Under Clause 6.3.4, filler metals listed in Table 6.4 are exempt from production lot testing when:

  • the Lowest Anticipated Service Temperature (LAST) is 10 °C (50 °F) or warmer, and
  • the weld metal shows at least 27 J (20 ft·lbf) at -18 °C (0 °F) or colder in the AWS A5 test, shown on the manufacturer's Certificate of Conformance.

Table 6.4 covers E7018, E7018-1, E7018-C3L and E8018-C3 SMAW electrodes and ER70S-2, -3, -6, -7, -8 and ER80S-Ni solid GMAW wires. The commentary explains that these routinely meet the Demand Critical properties. When LAST is below 10 °C, the supporting tests move to no more than 11 °C above LAST for 70 and 80 ksi products, or to LAST for 90 ksi products.

A decision path for each product

For each filler metal on a Demand Critical WPS, a fabricator can work through four questions:

  1. Is the product on Table 6.4, and is LAST 10 °C or warmer? If yes and the certificate shows 27 J at -18 °C, no lot testing is needed.
  2. Is the WPS prequalified, and does the manufacturer have three-lot Annex A data plus an ABS, Lloyd's, ASME or DoD audit with a current three-year retest? If yes, the product is exempt.
  3. Is the WPS qualified by test with three lots in three years, or with this lot? If yes, use that basis.
  4. None of the above? Test each lot to its A5 specification and, for prequalified WPSs, Annex A.

Recording the answer for each product, with the supporting documents, is what turns lot control into an audit-ready record.

Practical lot control in the shop

Paperwork only works if the lot on the floor matches the lot in the file. Good practice includes:

  • Receiving inspection that records the trade name, diameter, lot number and lot class for every delivery of filler metal and flux, checked against the certificate.
  • Segregated storage for consumables approved for Demand Critical welds, labeled with the WPS numbers they may be used on.
  • Issue records that tie the lot issued to a welder to the joints welded that shift, through the welder identification system of Clause 6.10.
  • Quarantine of any lot without the required documents until the documents arrive or the lot is moved to non-Demand Critical work.
  • Flux control for SAW, since recycled flux and blended flux can change properties. The flux lot is part of the record.

Planning lots for a large seismic package

On a big job, lot control is also a purchasing question. A seismic package of several thousand tonnes can consume many tonnes of flux cored wire and SAW flux over six to twelve months. Three habits keep that from becoming a testing burden:

  • Buy deep, not often. Where lot testing cannot be avoided, ordering one large lot for the whole package means one set of tests instead of several. Manufacturers can often reserve a lot for a project if asked early.
  • Standardize products across WPSs. Using the same wire for beam flange welds, column splices and continuity plates, where the joints allow it, reduces the number of trade names and diameters that need data.
  • Check the three-year clock. An exemption that relies on the manufacturer's periodic retest can lapse in the middle of a long job. Asking for the date of the last Annex A retest at the start avoids a surprise halfway through.

For a fabricator overseas, the same records also travel with the steel. The general contractor's special inspector in the United States may never visit the shop, so the lot records in the quality file are the evidence that the welds on the piece in front of them were made with approved consumables.

Common questions

Do we need lot control for the whole SFRS? No. Clause 6.3 applies only to filler metal for Demand Critical welds. Other SFRS welds follow Part A of Clause 6, where the Certificate of Conformance is enough.

Does a new diameter need its own data? Yes. The three-lot condition is per trade name and diameter.

Is a manufacturer's ISO 9001 certificate enough? Not by itself. The listed bodies are ABS, Lloyd's Register, ASME and the US Department of Defense. Any other program must be acceptable to the Engineer, so ask before relying on it.

How World Steel controls filler metal lots

At World Steel, filler metal and flux for seismic jobs go through the same incoming material checkpoint as steel plate. Each lot is recorded with its certificate, matched to the WPSs it is approved for and stored separately. For Demand Critical welds, the exemption basis or lot test results for each product are filed in the project quality record before the lot is issued. Our quality system is accredited to IAS AC472, and our shop welding procedures and welders are qualified to AWS D1.8.

For the test that underpins most lot exemptions, see heat input envelope testing. For the moisture side of filler metal control, see FCAW electrode exposure limits.

Quick answers

What is a production lot of filler metal?

A quantity of electrode, wire or flux made under controlled conditions as defined in AWS A5.01. D1.8 requires the tighter lot classes: C3 or C4 for SMAW, S3 or S4 for solid wire, T3 or T4 for composite wire and FCAW, and F2 for SAW flux.

Does every lot need testing?

For demand critical welds, yes, unless an exemption applies. The most common exemption needs three lots tested to Annex A and a manufacturer audited by ABS, Lloyd's Register, ASME, the US Department of Defense or a program acceptable to the Engineer.

Are E7018 electrodes exempt?

E7018-type SMAW electrodes and ER70S solid wires listed in Table 6.4 are exempt when LAST is 10 °C or warmer and the certificate shows at least 27 J at -18 °C.

Does lot control apply to non-demand critical welds?

No. Clause 6.3 applies only to filler metal for demand critical welds.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AWS D1.8 seismic fabrication series

Twenty in-depth articles that follow a seismic weld from the drawings to the last test report. Each one explains a part of AWS D1.8:2025 in plain terms and lists the checks a general contractor can ask the fabricator about.

Drawings and scope

What the code covers, which welds are Demand Critical, and the data the drawings must carry.

Procedures and welders

The WPS, the restricted access welder test and the bottom flange sequence.

Details and Protected Zones

Access holes, backing, weld tabs, k-area details, Protected Zones and repairs.

Inspection and testing

Who inspects what, inspector qualifications, and UT and MT done the D1.8 way.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.