When a building official reviews a steel package, one of the first questions is whether the fabricator is "approved". In the International Building Code that word has a specific meaning, and two programs are commonly used to show it: AISC certification and IAS AC472 accreditation. This article explains both in plain terms.
Why the building official cares
The IBC requires special inspection of structural steel fabrication. Section 1704.2.5 lets the building official reduce or waive inspection at the fabricator's shop when the fabricator is approved and maintains a quality system that is audited by an approved agency. That saves the owner money and the schedule time of having inspectors sit in the shop.
So the purpose of both programs is the same: give the building official confidence that the shop's own quality system works, and that someone independent checks it regularly.
AISC certification
The American Institute of Steel Construction runs a certification program for fabricators and erectors. Certified fabricators are audited against AISC's certification standard, with categories for building and bridge work and endorsements for things like fracture-critical members and sophisticated paint systems. The program is widely known to US engineers and specified by name in many project specifications.
IAS AC472 accreditation
The International Accreditation Service is an accreditation body in the same family as the International Code Council, which publishes the IBC. AC472 is IAS's accreditation criteria for inspection programs for manufacturers of structural steel and metal building systems. An accredited fabricator has a documented quality and inspection program, trained inspection personnel and records that IAS auditors review on a fixed cycle.
Because IAS sits alongside the code family, building officials recognize AC472 accreditation as evidence of an approved fabricator. It is also open to fabricators outside the US, which is why it is often the program behind steel fabricated abroad for US jobs.
Side by side
| AISC certification | IAS AC472 accreditation | |
|---|---|---|
| Run by | American Institute of Steel Construction | International Accreditation Service |
| What is audited | Fabricator quality management system, by category | Inspection program for structural steel and metal building manufacturing |
| How officials use it | Approved fabricator under IBC 1704.2.5 | Approved fabricator under IBC 1704.2.5 |
| Where to verify | AISC certified company directory | IAS accredited organization directory |
What to ask any fabricator
Whichever program a fabricator holds, ask for:
- The certificate or accreditation, its scope and the plant address it covers.
- The date of the last audit and how often audits happen.
- Their written quality manual and inspection procedures.
- Examples of inspection records for a past project.
- How nonconformances are found, recorded and closed.
What an audit actually looks at
Auditors in both programs typically review:
- the fabricator's quality manual and procedures;
- personnel qualifications for inspectors and welders;
- calibration of measuring equipment;
- control of materials, including mill certificates and heat number traceability;
- inspection records from recent jobs;
- how nonconformances are recorded, fixed and prevented from recurring.
A shop that passes these audits repeatedly has shown it can follow its own system, not only produce a good certificate.
How to check a listing
Both programmes publish their listings. For IAS, search the accreditation directory for the fabricator's name and check the scope, the plant address and the expiry date. A certificate for one plant does not cover a sister plant in the same group. World Steel's IAS AC472 accreditation covers its own plant in Vietnam, which IAS has audited twice a year since 2019. Ask any fabricator which plant will build your steel, then check that plant's listing.
Accreditation is a start, not the finish
Neither program replaces the project's own requirements. Your specification, your Engineer of Record and your building official still decide what inspection is needed for this project, which welds need nondestructive testing and what records must come with the steel. World Steel's plant has held IAS AC472 since 2019 and is audited twice a year; we still agree inspection hold points and records with every US customer, because every project is different.
Quick answers
Does IBC accept IAS AC472 accredited fabricators?
IBC Section 1704.2.5 allows special inspection at the fabricator to be reduced when the fabricator is approved, and building officials commonly recognize IAS AC472 accreditation for that purpose. The building official makes the final call.
Is World Steel AISC certified?
World Steel's plant is accredited under IAS AC472, the first and only one in Vietnam, audited twice a year since 2019. Standards such as AISC 360 are what the steel is designed and fabricated to.
How do I verify an accreditation?
Search the accreditor's public directory for the fabricator's name and check the scope, the plant address and the expiry date.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- Quality hubInspection, testing and sign-off at the plant
- Accredited testing labsILAC ISO/IEC 17025 testing on every project
- Online factory auditWalk the shop live with our QA team
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors
- Solutions by stateState-by-state steel solutions