Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Haiti · Hurricanes and floods

Hurricane and flood-resistant steel buildings for Haiti

Hurricane Matthew tore across the southern peninsula in 2016, hitting Les Cayes and Jérémie hardest. In 2004, Tropical Storm Jeanne sent floods through Gonaïves. With steep, deforested hills above many towns, heavy rain turns quickly into flash floods and landslides. We design the whole load path, from cladding to anchor bolts, for the wind your engineer sets, and work with your engineer on floor levels for the flood.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Port-au-Prince or Cap-Haïtien.

Six-story steel frame seen from the front, floor deck in place
Going up beside the plant in Vietnam: World Steel framed its own office building.
Storms
Jeanne 2004, Matthew 2016
Floods
Flash floods off steep hills
Coast
Storm surge in low towns
Our part
Wind load path and raised floors

Where storms win

Four places we check first

Roof uplift

On roofs in Haiti, edge and corner zones carry much more suction than the middle.

Large openings

A failed door pressurizes the building; we design for it.

Floods

Floors and equipment kept above the design flood your engineer sets.

Connections

Purlin cleats, braces and anchors carry reversing storm loads.

By site

How the site changes the design

Your engineer of record in Haiti confirms the values.

SiteWhat changes
Southern peninsula coastHigh exposure, surge, salt spray
River towns, Gonaïves and the ArtiboniteRiver and flash flood levels
Hillsides above townsTopographic speed-up, landslide risk
Port-au-Prince plainTown exposure, flooding in ravines
Central PlateauOpen terrain, lower storm surge risk

Shelters

Buildings that shelter people

Schools and halls

Many serve as shelters and need a higher risk category.

Protected openings

Doors, shutters and glazing designed with the frame.

Back-up power

Steel supports for generators, solar and tanks sized for storm loads.

Haiti

What we do not claim

We do not publish wind ratings or certify buildings in Haiti for a hurricane category. The design is checked by your engineer of record for the loads and flood levels set for your site.

Products and solutions

The World Steel pages behind this guide

Department by department

How this applies in your department

Haiti has 10 departments. Open Sud-Est, Nippes or Grand’Anse to see the local wind, ground and coast, the road from Port-au-Prince and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Haiti project is cut, welded, inspected and packed.

Welded members with drilled end plates laid out side by side
Members with drilled end plates waiting for release, Vietnam plant.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.

Q&A

What Haitian buyers ask

Can one building be designed for earthquakes and hurricanes?

Yes. Your engineer checks both; a light steel frame with good bracing and connections handles the seismic and wind loads together.

Can a steel building be raised above flood level?

Yes. Steel columns can carry the floor on a raised platform, with bracing designed for wind, water and earthquakes.

Do you supply the roof and wall cladding too?

Yes. Roof and wall panels, purlins, girts and fixings can ship with the frame, designed for the same wind at your site in Haiti.

Official sources: NOAA National Hurricane Center

Contact World Steel · Haiti

Talk to us about steel for Haiti

WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.