Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Sud-Est · Department

Steel buildings and structural steel for Sud-Est, Haiti

Sud-Est lies on the southern coast below the mountains, with Jacmel as its capital: a town of 19th-century iron-balconied buildings, famous for its carnival and crafts.

West and south-east · Capital Jacmel

Capital
Jacmel
Group
West and south-east
Main towns
Jacmel, Marigot, Bainet
Port
Port-au-Prince

Site conditions in Sud-Est

What the site asks of your steel

Seismic
High, Enriquillo fault
Wind
Southern coast storms
Flood
Flash floods
Air
Salt on the coast

Our design note. Jacmel’s historic ironwork shows steel’s long history here. New schools, markets and public buildings need ductile frames, coastal coatings and members sized for the mountain road.

Sud-Est at a glance

The ground, the work and the road in

Ground and climate

Narrow coastal strip below steep mountains; rivers that flood fast after heavy rain.

What gets built

Crafts and culture, tourism, fishing, agriculture, schools and services.

Getting steel there

About two hours south of Port-au-Prince over the mountains; Jacmel has a small port.

Towns: Jacmel · Marigot · Bainet · Belle-Anse · Cayes-Jacmel

Steel we recommend

What we fabricate for Sud-Est

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Schools and universities

Classrooms, halls and campus buildings designed for earthquakes and storms.

Sports facilities and arenas →

Markets and commercial buildings

Covered markets, supermarkets, shops and offices.

Commercial steel buildings →

Public buildings and shelters

Town halls, community centers and hurricane shelters.

Sports facilities and arenas →

Contractors in Sud-Est

You win the job in Sud-Est. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Sud-Est

Can long members reach Jacmel over the mountains?

We split long members at bolted splices where the road needs it, and pack loads for the route.

Is Sud-Est high seismic?

Yes. It lies along the Enriquillo fault; your engineer sets high seismic values.

West and south-east

Other departments: west and south-east

Ouest with Port-au-Prince and the Gonâve island, and Sud-Est with Jacmel.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Haiti. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Haiti

Talk to us about steel for Sud-Est

Send the drawings or the site, size and use. We design or detail the steel for Sud-Est’s earthquake, hurricane and flood conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port-au-Prince. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.