Seismic frames
How we detail for earthquakes
Moment frames
Special and intermediate moment frames for open plans.
Braced frames
Concentrically and eccentrically braced frames for schools and hospitals.
AWS D1.8 welding
Qualified procedures and welders for demand-critical welds.
Base plates and anchors
Base plates sized for seismic shear and uplift together.
By area
Where the shaking is strongest
General notes; your engineer of record sets the design values from the code and the soil report.
| Area | Main source | What it means |
|---|---|---|
| Port-au-Prince and Léogâne | Enriquillo fault | High seismic values; soft soils amplify shaking |
| Southern peninsula | Enriquillo fault | High values from Jacmel to Jérémie |
| North coast | Septentrional fault | High values around Cap-Haïtien and Port-de-Paix |
| Artibonite and Centre | Regional faults | Moderate to high; river soils checked |
Who does what
Seismic work, split clearly
World Steel supplies
- Frames detailed to AISC 341
- Welding by AWS D1.8-qualified welders
- Protected zones marked on request
- Plate with EN 10204 3.1 and CVN on request
- Remote or in-person inspector access
In Haiti, the contractor and the engineer of record arrange
- Geotechnical investigation and site class
- Seismic design category and values
- Foundation design and construction
- Special inspections on site
- Erection to the drawings
Haiti
What we do not claim
No building is earthquake-proof. We design and fabricate to the seismic basis your engineer of record sets and supply the records to show it.
Products and solutions
The World Steel pages behind this guide
Department by department
How this applies in your department
Haiti has 10 departments. Open Sud, Nord-Est or Centre to see the local wind, ground and coast, the road from Port-au-Prince and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Haiti project is cut, welded, inspected and packed.
Q&A
What Haitian buyers ask
Why is steel a good choice for earthquakes in Haiti?
Steel frames are much lighter than concrete, so earthquake forces are smaller, and ductile steel bends without sudden collapse when detailed to AISC 341.
Are your welders qualified for seismic work?
Yes. Our shop has AWS D1.8-qualified welding procedures and welders for demand-critical welds.
Can an inspector check the steel before it ships?
Yes. Remote or in-person inspector access to our plant is available on request, with records for every member.
Official sources: USGS Earthquake Hazards Program
Haiti solutions
Every Haiti guide
Related pages
Code facts on this page summarize practice in Haiti and the standards it references. They are not legal or engineering advice; your engineer of record and the Ministry of Public Works (MTPTC) and the commune confirm the code and edition in force for your project.
Contact World Steel · Haiti
Talk to us about steel for Haiti
WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.