Site conditions in Nord
What the site asks of your steel
- Seismic
- High, Septentrional fault
- Wind
- Atlantic hurricanes
- Flood
- Coastal plain rivers
- Air
- Salt in Cap-Haïtien
Our design note. Cap-Haïtien and its plain need warehouses, markets, schools and tourism buildings designed for the northern fault and Atlantic storms. Steel lands right at the city’s port.
Nord at a glance
The ground, the work and the road in
Ground and climate
Coastal plain around Cap-Haïtien rising to the mountains of the Massif du Nord.
What gets built
Port and commerce, tourism around the Citadelle and Labadee, agriculture, schools and services.
Getting steel there
The port of Cap-Haïtien is in the department; roads lead east to Nord-Est and south to the Artibonite.
Towns: Cap-Haïtien · Milot · Limbé · Plaine-du-Nord · Acul-du-Nord
Steel we recommend
What we fabricate for Nord
The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.
Warehouses and logistics
Clear-span warehouses for relief stocks, food, imports and distribution.
Warehouse and distribution buildings →Markets and commercial buildings
Covered markets, supermarkets, shops and offices.
Commercial steel buildings →Schools and universities
Classrooms, halls and campus buildings designed for earthquakes and storms.
Sports facilities and arenas →Contractors in Nord
You win the job in Nord. We fabricate the steel.
Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.
Q&A
Questions about steel in Nord
Can steel for northern projects ship to Cap-Haïtien?
Yes. Cap-Haïtien is the natural port for the north; we confirm it with the importer for each shipment.
Is the north also an earthquake zone?
Yes. The Septentrional fault runs along the north coast, so seismic design is required there too.
North
Other departments: north
Nord-Ouest, Nord and Nord-Est: Cap-Haïtien, the Citadelle and the industrial parks near the border.
Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Haiti. World Steel designs and fabricates the steel; the contractor erects it.
Contact World Steel · Haiti
Talk to us about steel for Nord
Send the drawings or the site, size and use. We design or detail the steel for Nord’s earthquake, hurricane and flood conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Cap-Haïtien or Port-au-Prince. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.