Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Centre · Department

Steel buildings and structural steel for Centre, Haiti

Centre covers the Central Plateau up to the Dominican border, with Hinche as its capital and Mirebalais, home to a large teaching hospital, near the road from Port-au-Prince.

Artibonite and Centre · Capital Hinche

Capital
Hinche
Group
Artibonite and Centre
Main towns
Hinche, Mirebalais, Lascahobas
Port
Cap-Haïtien or Port-au-Prince

Site conditions in Centre

What the site asks of your steel

Seismic
Moderate to high
Wind
Inland, lower exposure
Ground
Upland soils
Site
Rural roads

Our design note. The Central Plateau needs hospitals, schools and farm buildings delivered over long rural roads. Complete steel kits with clear erection drawings suit local crews.

Centre at a glance

The ground, the work and the road in

Ground and climate

Upland plateau and valleys, with the Péligre lake and dam on the Artibonite.

What gets built

Agriculture, hydroelectric power at Péligre, health and education services, cross-border trade.

Getting steel there

About two to four hours from Port-au-Prince by National Road 3.

Towns: Hinche · Mirebalais · Lascahobas · Belladère · Thomassique

Steel we recommend

What we fabricate for Centre

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Hospitals and clinics

Multi-storey and single-storey health buildings with seismic frames.

Multi-storey steel framing →

Schools and universities

Classrooms, halls and campus buildings designed for earthquakes and storms.

Sports facilities and arenas →

Agricultural buildings

Rice, coffee and mango stores, packing houses and agro-processing sheds.

Agricultural steel buildings →

Contractors in Centre

You win the job in Centre. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Centre

Can you supply hospital buildings on the Central Plateau?

Yes. Seismic frames for health buildings, packed by building and sized for the road from the port.

Do inland sites need less corrosion protection?

Usually yes. Enclosed inland steel needs a lighter system than coastal steel.

Artibonite and Centre

Other departments: artibonite and centre

The rice valley of the Artibonite and the Central Plateau up to the Dominican border.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Haiti. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Haiti

Talk to us about steel for Centre

Send the drawings or the site, size and use. We design or detail the steel for Centre’s earthquake, hurricane and flood conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Cap-Haïtien or Port-au-Prince. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.