Haiti · Building code

Structural steel and the Haiti National Building Code

After the 2010 earthquake, Haiti adopted a National Building Code, the Code National du Bâtiment d’Haïti (CNBH), in 2012. It sets seismic and wind loads for the country and refers to US standards for much of the detail: the IBC, ASCE 7 and the AISC specifications for steel. Development partners often add their own requirements on top. Your engineer of record sets the basis; we state it on the first sheet of our calculations.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Port-au-Prince or Cap-Haïtien.

Columns and floor beams of a multi-story steel frame partway through erection
Going up beside the plant in Vietnam: World Steel framed its own office building.
Code
CNBH 2012
References
IBC, ASCE 7, AISC
Ministry
MTPTC
Our part
Code stated on sheet one

Why it matters

One clear design basis for every reviewer

Ministry engineers, funders’ technical advisors and the engineer of record each read the drawings for a different reason. A clear statement of the code, the seismic and wind values and the materials on the first sheet keeps every reviewer on the same page.

Projects funded by development banks and international agencies often require third-party review and inspection. We supply calculations, drawings and fabrication records in a form those reviewers can follow, in English.

Design basis

What the steel design states

The items we confirm with your engineer of record in Haiti before modeling.

ItemWhat we state
CodeCNBH 2012 and the US editions it references
SeismicSite class, spectral values and seismic design category
WindBasic wind speed, exposure and risk category
SteelAISC 360 design, AISC 341 seismic detailing
Owner specsFunder or owner requirements where they apply

Who does what

Review work, split clearly

World Steel supplies

  • Steel design or detailing to the Haiti National Building Code
  • Calculations and drawings for review
  • Answers to plan-review comments on the steel in Haiti
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

In Haiti, the contractor and the engineer of record arrange

  • Permits with the ministry and the commune
  • Third-party review where required
  • Geotechnical report and site class
  • Inspections on site
  • Foundations and erection

Haiti

What we do not claim

World Steel holds no approval, licence or registration in Haiti and does not apply for permits. The engineer of record approves the design and your team files it with the authorities in Haiti.

Products and solutions

The World Steel pages behind this guide

Department by department

How this applies in your department

Haiti has 10 departments. Open Ouest, Nord or Artibonite to see the local wind, ground and coast, the road from Port-au-Prince and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Haiti project is cut, welded, inspected and packed.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Plate and coil strip racked by grade and heat number in the store
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.

Q&A

What Haitian buyers ask

Does the Haiti code use US standards?

Yes, for much of the detail. The CNBH sets loads for Haiti and refers to the IBC, ASCE 7 and AISC standards. Your engineer of record sets the exact basis.

Can you work to a funder’s technical requirements?

Yes. We design and fabricate to the basis your engineer agrees with the owner and the funder, and supply the records their inspectors ask for.

Are your drawings in French?

Our calculations and drawings are in English. Your engineer or architect of record can add French notes for local reviewers where needed.

Contact World Steel · Haiti

Talk to us about steel for Haiti

WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.