Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Ouest · Department

Steel buildings and structural steel for Ouest, Haiti

Ouest holds Port-au-Prince, the capital and largest city, with Carrefour, Pétion-Ville and Croix-des-Bouquets around it, Léogâne near the 2010 epicentre, and the island of La Gonâve in the bay.

West and south-east · Capital Port-au-Prince

Capital
Port-au-Prince
Group
West and south-east
Main towns
Port-au-Prince, Carrefour, Pétion-Ville
Port
Port-au-Prince

Site conditions in Ouest

What the site asks of your steel

Seismic
High, Enriquillo fault
Ground
Soft soils by the bay
Wind
Hurricane exposure
Flood
Ravines in heavy rain

Our design note. Ouest has the highest seismic demand and the most construction in Haiti. Light, ductile steel frames, foundations for soft soils and floors above ravine floods are the rule.

Ouest at a glance

The ground, the work and the road in

Ground and climate

Alluvial plain of the Cul-de-Sac and coastal fans below steep mountains; soft soils near the bay; ravines run through the city.

What gets built

Government, the main port and airport, commerce and markets, industrial parks, schools, hospitals and housing.

Getting steel there

The port of Port-au-Prince is in the department; national roads lead north, south and east.

Towns: Port-au-Prince · Carrefour · Pétion-Ville · Léogâne · Croix-des-Bouquets

Steel we recommend

What we fabricate for Ouest

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Warehouses and logistics

Clear-span warehouses for relief stocks, food, imports and distribution.

Warehouse and distribution buildings →

Schools and universities

Classrooms, halls and campus buildings designed for earthquakes and storms.

Sports facilities and arenas →

Hospitals and clinics

Multi-storey and single-storey health buildings with seismic frames.

Multi-storey steel framing →

Contractors in Ouest

You win the job in Ouest. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Ouest

Can you supply warehouses near Port-au-Prince?

Yes. Clear-span warehouses and distribution centers with seismic frames, shipped to the port and trucked to site.

Is Port-au-Prince ground a problem for steel buildings?

Soft soils near the bay amplify shaking. A light steel frame reduces the forces; your engineer designs the foundations from the soil report.

West and south-east

Other departments: west and south-east

Ouest with Port-au-Prince and the Gonâve island, and Sud-Est with Jacmel.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Haiti. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Haiti

Talk to us about steel for Ouest

Send the drawings or the site, size and use. We design or detail the steel for Ouest’s earthquake, hurricane and flood conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port-au-Prince. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.