Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Nord-Est · Department

Steel buildings and structural steel for Nord-Est, Haiti

Nord-Est borders the Dominican Republic. It holds the Caracol Industrial Park, the free zone at Ouanaminthe on the border and the old fortified bay of Fort-Liberté.

North · Capital Fort-Liberté

Capital
Fort-Liberté
Group
North
Main towns
Fort-Liberté, Ouanaminthe, Caracol
Port
Cap-Haïtien or Port-au-Prince

Site conditions in Nord-Est

What the site asks of your steel

Seismic
High, northern faults
Wind
Atlantic hurricanes
Flood
Rivers and bays
Site
Industrial park plots

Our design note. Nord-Est’s industrial parks need factory and warehouse frames with long spans and seismic detailing. Steel lands at Cap-Haïtien, a short drive away.

Nord-Est at a glance

The ground, the work and the road in

Ground and climate

Coastal plain and bays, rising to dry hills toward the border.

What gets built

Apparel and assembly factories in the industrial parks, cross-border trade, agriculture and services.

Getting steel there

About an hour or two east of Cap-Haïtien by road; also reachable through the border crossing at Ouanaminthe.

Towns: Fort-Liberté · Ouanaminthe · Caracol · Trou-du-Nord · Terrier-Rouge

Steel we recommend

What we fabricate for Nord-Est

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Factories and industrial parks

Apparel and assembly plants, food processing and workshops.

Manufacturing plants and crane bays →

Warehouses and logistics

Clear-span warehouses for relief stocks, food, imports and distribution.

Warehouse and distribution buildings →

Schools and universities

Classrooms, halls and campus buildings designed for earthquakes and storms.

Sports facilities and arenas →

Contractors in Nord-Est

You win the job in Nord-Est. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Nord-Est

Can you supply factory buildings for the industrial parks?

Yes. Long-span plant buildings with seismic frames, packed in erection order and shipped to Cap-Haïtien.

Can steel come through the Dominican Republic?

Routes are agreed per shipment with the importer; the usual port for this area is Cap-Haïtien.

North

Other departments: north

Nord-Ouest, Nord and Nord-Est: Cap-Haïtien, the Citadelle and the industrial parks near the border.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Haiti. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Haiti

Talk to us about steel for Nord-Est

Send the drawings or the site, size and use. We design or detail the steel for Nord-Est’s earthquake, hurricane and flood conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Cap-Haïtien or Port-au-Prince. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.