Site conditions in Nippes
What the site asks of your steel
- Seismic
- High, 2021 epicentre
- Wind
- Hurricane exposure
- Flood
- Rivers and hills
- Air
- Salt on the coast
Our design note. Nippes is rebuilding after the 2021 earthquake. Light, ductile school and clinic frames with full inspection records are the priority.
Nippes at a glance
The ground, the work and the road in
Ground and climate
Coastal bays and hills, with Lake Miragoâne inland.
What gets built
Port activity at Miragoâne, agriculture, fishing, schools and health services.
Getting steel there
About two to three hours west of Port-au-Prince on National Road 2.
Towns: Miragoâne · Anse-à-Veau · Petit-Trou-de-Nippes · Baradères · Fonds-des-Nègres
Steel we recommend
What we fabricate for Nippes
The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.
Schools and universities
Classrooms, halls and campus buildings designed for earthquakes and storms.
Sports facilities and arenas →Hospitals and clinics
Multi-storey and single-storey health buildings with seismic frames.
Multi-storey steel framing →Warehouses and logistics
Clear-span warehouses for relief stocks, food, imports and distribution.
Warehouse and distribution buildings →Contractors in Nippes
You win the job in Nippes. We fabricate the steel.
Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.
Q&A
Questions about steel in Nippes
Can you supply rebuild programs in Nippes?
Yes. Repeated school and clinic designs fabricated as a series, packed by building, with inspection records.
Can steel ship to Miragoâne?
Routes are agreed per shipment; most steel arrives through Port-au-Prince and travels by road.
Southern peninsula
Other departments: southern peninsula
Nippes, Sud and Grand’Anse: Les Cayes, Jérémie and the long south-western peninsula.
Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Haiti. World Steel designs and fabricates the steel; the contractor erects it.
Contact World Steel · Haiti
Talk to us about steel for Nippes
Send the drawings or the site, size and use. We design or detail the steel for Nippes’s earthquake, hurricane and flood conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port-au-Prince. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.