Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Grand’Anse · Department

Steel buildings and structural steel for Grand’Anse, Haiti

Grand’Anse is the western end of the southern peninsula, green and remote, with Jérémie, the ‘city of poets’, as its capital. Hurricane Matthew devastated it in 2016.

Southern peninsula · Capital Jérémie

Capital
Jérémie
Group
Southern peninsula
Main towns
Jérémie, Dame-Marie, Anse-d’Hainault
Port
Port-au-Prince

Site conditions in Grand’Anse

What the site asks of your steel

Wind
Matthew 2016
Seismic
High, Enriquillo fault
Flood
Mountain rivers
Site
Remote roads

Our design note. Grand’Anse needs storm shelters, schools and clinics that reach the end of a long road. Compact, complete steel kits and erection drawings for local crews make the job work.

Grand’Anse at a glance

The ground, the work and the road in

Ground and climate

Mountainous and forested, with rivers reaching a rocky coast.

What gets built

Agriculture including breadfruit, cocoa and coffee, fishing, schools and health services.

Getting steel there

About six to eight hours from Port-au-Prince by road; small coastal ports serve local cargo.

Towns: Jérémie · Dame-Marie · Anse-d’Hainault · Corail · Pestel

Steel we recommend

What we fabricate for Grand’Anse

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Public buildings and shelters

Town halls, community centers and hurricane shelters.

Sports facilities and arenas →

Schools and universities

Classrooms, halls and campus buildings designed for earthquakes and storms.

Sports facilities and arenas →

Hospitals and clinics

Multi-storey and single-storey health buildings with seismic frames.

Multi-storey steel framing →

Contractors in Grand’Anse

You win the job in Grand’Anse. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Grand’Anse

Can steel reach Jérémie?

Yes, by road from the port. We size and pack members for the long mountain route.

Can you design storm shelters?

Yes. Your engineer sets the higher risk category and we design the frame, openings and connections to it.

Southern peninsula

Other departments: southern peninsula

Nippes, Sud and Grand’Anse: Les Cayes, Jérémie and the long south-western peninsula.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Haiti. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Haiti

Talk to us about steel for Grand’Anse

Send the drawings or the site, size and use. We design or detail the steel for Grand’Anse’s earthquake, hurricane and flood conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port-au-Prince. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.