Site conditions in Nord-Ouest
What the site asks of your steel
- Seismic
- High, Septentrional fault
- Wind
- Atlantic exposure
- Climate
- Dry, droughts
- Air
- Salt on the coast
Our design note. Nord-Ouest needs schools, clinics and food warehouses for remote, dry communities. Seismic frames, wind-rated roofs and galvanized steel for the coast fit the conditions.
Nord-Ouest at a glance
The ground, the work and the road in
Ground and climate
Dry hills and coastal plains, among the driest parts of the country.
What gets built
Agriculture, fishing, small port trade, schools and health services.
Getting steel there
About three to five hours west of Cap-Haïtien by road; Port-de-Paix has a small port.
Towns: Port-de-Paix · Saint-Louis-du-Nord · Jean-Rabel · Môle-Saint-Nicolas · Île de la Tortue
Steel we recommend
What we fabricate for Nord-Ouest
The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.
Schools and universities
Classrooms, halls and campus buildings designed for earthquakes and storms.
Sports facilities and arenas →Warehouses and logistics
Clear-span warehouses for relief stocks, food, imports and distribution.
Warehouse and distribution buildings →Hospitals and clinics
Multi-storey and single-storey health buildings with seismic frames.
Multi-storey steel framing →Contractors in Nord-Ouest
You win the job in Nord-Ouest. We fabricate the steel.
Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.
Q&A
Questions about steel in Nord-Ouest
Can you supply food warehouses in Nord-Ouest?
Yes. Clear-span warehouses packed for the road from Cap-Haïtien or another agreed port.
Is Nord-Ouest an earthquake zone?
Yes. The Septentrional fault runs along the north coast, so seismic design applies.
North
Other departments: north
Nord-Ouest, Nord and Nord-Est: Cap-Haïtien, the Citadelle and the industrial parks near the border.
Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Haiti. World Steel designs and fabricates the steel; the contractor erects it.
Contact World Steel · Haiti
Talk to us about steel for Nord-Ouest
Send the drawings or the site, size and use. We design or detail the steel for Nord-Ouest’s earthquake, hurricane and flood conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Cap-Haïtien or Port-au-Prince. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.